Absolute Rules
Operating Equipment
Emergency Preparedness
Bouchier Policies & Procedures
Miscellaneous
100
Workers who are under the influence of using alcohol or drugs are violating this Absolute Rule.
What is Fit For Duty?
100
This must be completed prior to operating any Bouchier vehicles or equipment.
What is Light Vehicle Daily Maintenance Log? 360 walk around?
100
_______ must be given prior to residence returning into building.
What is the all clear?
100
Field Level Hazard Assessment (FLHA)
What must you complete prior to starting a job?
100
Comply, Respect, Intevene
What is Shell's 3 Golden Rules?
200
If involved in any injury, incident or near miss this action must be taken.
What is immediate reporting?
200
This specialized PPE is required when working from an Ewp.
What is travel restraint system?
200
The designated location during evacuation so a head count can be facilitated.
What is a muster point?
200
Hard hat, gloves, eye protection, steel toed boots.
What is Bouchier's general PPE requirements?
200
Fall protection is required if working within __________ of an unprotected edge.
What is 1.8 meters (6')?
300
All personal are required to ensure equipment or power sources being repaired, serviced, maintained or inspected be isolated of all forms of hazardous energy through this process.
What is LOTO?
300
A ______ must be in place prior to backing up any Bouchier vehicles.
What is a spotter?
300
STCC rings both ____ & _____ stage alarms.
What are slow & Fast stage alarms?
300
This is the amount of weight allowed to be lifted by a single person as per SJP 4.12 Manual Lifting/Carrying.
What is 25 KG or 55 LBS?
300
This document identifies and records the tasks to be taken to prepare the equipment, building or area for the work, and the safety precautions, safety equipment or specific procedures that must be followed to enable the worker(s) to safely complete the work.
What is a Permit to Work?
400
11. Only operate equipment when deemed ________, and authorized by a Supervisor.
What is competent?
400
This deviation requires a supervisor to sign off and a spotter to be in place?
What is the 3 foot rule?
400
A ___ _____ is a method of practicing how a building would be evacuated in the event of a fire or other emergency.
What is fire drill?
400
A review of the prior day activities, review of the day’s activities, safety topic, and employee input is conducted each day.
What is a Daily Toolbox?
400
No worker is to carry out any work or operate any tool, appliance, or equipment if they have reasonable and probable grounds to believe that the work presents imminent danger to their own, or another worker’s, health and safety.
What is right to refuse work?
500
The use of these are prohibited while operating vehicles or equipment as per Absolute Rule #9.
What are cell phones?
500
These 3 items are requiired prior to working above heights.
What is Fall Pro Plan, Fall Protection, Permit?
500
A portable electronic device that automatically diagnoses the life-threatening cardiac arrhythmia's of ventricular fibrillation and ventricular tachycardia in a patient.
What is an AED?
500
This program is to heighten the visibility of new workers and prevent incidents during the initial 3 months of work. New workers are paired with experienced workers to advise and consult them.
What is Green Hand Mentorship Program?
500
105 dB
At what level is dual hearing protection will be required?
M
e
n
u