The number of phases a typical building project may be divided into
What are the five phases?
A reinforced concrete, four-side-supported slab panel is
What is a one-way slab or a two-way slab?
Establishing the project's economic feasibility and its overall budget is part of the design phase of the project.
False
The two main categories under which all building loads may be classified are
What are gravity loads and lateral loads?
The term MEP is an acronym for
What are mechanical, electrical, and plumbing?
A reinforced-concrete, four-side-supported slab panel measuring 15 ft × 22 ft is
What is a two-way slab?
The construction drawings of a building project are drawings that the architect uses to explain the design to the owner.
False
The loads on a floor are generally expressed in
What is lb/ft2?
The program for a building project is prepared by the
What is the owner?
A flat plate floor consists of
What is a slab of constant thickness?
The project manual includes the project's construction drawings.
False
The loads on a beam are generally expressed in
What is lb/ft?
In a typical building project, the coordination of the building's design is done by
What's the architect?
The primary reason for using post-tensioned concrete floors is to
What is reduce floor depth?
All required surety bonds must be provided by the GCs who are bidding for the project, along with their bids, that is, at the time of bidding.
False
Which occupancy has the highest floor live load?
What is library stock rooms?
The construction drawings of a building project are prepared during the
What is the CD stage of the project
Portland cement used in precast concrete members is generally
What is Type III?
Where the owner is sufficiently familiar and confident of the financial and contractual capabilities of the GCs bidding for the project, the owner may not require the bid bond. This reduces the total cost of construction.
True
Highest wind speeds are usually obtained in
What is a tornado?