The Building Team
Construction Documents
Hoarding
Random
100

_______________ team consist of all the members that  play a role in coming up with the aesthetic and the structural design of the building.

The Design Team

100

What are construction documents?

These are the set of documents that contains information about the building project.

100

What is hoarding?

This is the a temporary fencing or barrier that is erected around the perimeter of a building site.

100

What is the hoarding?

A temporary fence around a construction site

200

________________ is the team of workers that are responsible for planning, managing, and executing the construction work on a project.

The Contractor's Team

200

__________________ are a set of detailed drawings to scale that that provides an accurate representation of the building to be constructed.

Working Drawings

200

Give the name of any two material used for hoarding. 

*Plywood

*Meal Sheeting such as Galvanized Aluminum Sheeting

*Mesh Inserts



300

Give the name of any four members of the building team.

The Contractor

* Project Manager

* Subcontractors

* Trade Foreman

* Tradesmen

* Labourers

- Architect

- Land Surveyor

- Quantity Surveyor

- Civil Engineer

300

Give the name of any three(3) construction documents

Working Drawings (Building Plan)

Surveyor’s Report/Diagram

Bill of Quantities

Building Specifications

Construction Project Schedule

300
List three (3) reasons for hoarding.

*Preventing Unauthorized Access to the Building Site

*Protecting the Public from Harm or Danger

*Preventing the Theft of Tools, Materials and other Equipment from the Site

*Providing a level of Privacy on the Construction Site

300

What is a theodolite used for?

Leveling and measuring

400

This person provides accurate site measurements, including boundaries, elevations, and structures, to help architects and engineers create precise construction designs.

Land Surveyor

400

_________________ are construction documents that outline all the requirements for completion of a building.

Building Specifications

500

1. This person estimates material quantities and calculates the total cost of a construction project, including material and labour expenses.


2. This person ensures a building’s structural stability and safety, working closely with the architect to balance strength, aesthetics, and functionality.

1. Quantity Surveyor


2. Engineer

500

1. ________________ is a detailed document that illustrates the quantity of materials that are needed for the various tasks that ate to be carried out in the building project.


2. This document is a detailed plan that outlines all the tasks, activities, and milestones involved in a construction project.

Bill of Quantity


Construction schedule

500

What are two functions of a site office?

  • Storing important construction documents
  • Conducting administrative tasks such as payroll and meetings