WHAT DOES IT MEAN?
STANDARD DEVIATION
TANGO ALPHA BRAVO
R&R
MIXED WASTE
100
Location where a waste stream exits a process unit component prior to handling or treatment. What is point of waste generation?
What is a point of waste generation?
100
The frequency by which waste management units must be visually inspected.
What is quarterly?
100
Papa Oscar Golf.
What is point of generation?
100
Frequency by which a facility must certify that all affected waste management units have been inspected.
What is quarterly?
100
These types of waste streams may be characterized downstream from the POG and after a certain kind of treatment.
What are sour water waste streams?
200
A system of piping or duct work that routes vapors from a waste management unit to a control device.
What is a closed-vent system?
200
Examples of these include barges, vacuum trucks, and tank cars.
What are containers?
200
Mike Oscar Charlie.
What is management of change?
200
In general, the length of time that records must be kept.
What is 2 two years?
200
Under the 6 BQ compliance option, these types of waste streams must be controlled.
What are organic waste streams?
300
Description of a waste stream having a flow-weighted annual average water content of greater than 10 percent.
What is aqueous?
300
Allowed if a repair cannot be affected without a partial or complete process unit shutdown.
What is delay of repair?
300
November Delta Echo.
What is no detectable emissions?
300
Findings noted during visual inspections must be reported at this frequency.
What is annually?
300
Benzene in waste generated by this type of activity need not be counted on the TAB (though waste may still need to be controlled).
What is remediation?
400
Less than 500 ppmv above background levels as measured by a detection instrument.
What is no detectable emissions?
400
Remove benzene from waste to a level of less than 10 ppmw on a flow-weighted annual average or removes/destroys benzene in waste with an efficiency of 99% on a mass basis.
What is the general treatment standard?
400
India Delta Sierra.
What is an individual drain system?
400
Two means by which a facility may determine treatment system performance.
What are engineering calculations and performance tests?
400
Used to compare like volumes of aqueous and organic materials on a mass basis.
What is specific gravity?
500
A foam or liquid-filled primary seal mounted in contact with the liquid between the waste management unit wall and the floating roof continuously around the circumference.
What is a liquid-mounted seal?
500
Under this compliance option, benzene in exempted waste streams is counted at the first uncontrolled waste management unit.
What is the 6 BQ option or 61.342(e)?
500
Whiskey Mike Uniform.
What is a waste management unit?
500
Typical period of operation that must be reported when a control or device is not operating within design parameters.
What is 3 hours?
500
This type of control device must be monitored daily or at an interval of no less than 20 percent of design replacement interval.
What is a carbon adsorption system that does not regenerate the carbon bed directly on site (e.g., carbon canisters)?
M
e
n
u