Physical Builds
Who am I?
Acronyms
General
Baseline Schedule
100

What city is data center 1 located?

Vancouver

100

Who recently went to a Billy Joel concert?

Rob Manery

100

MSA

Master Service Agreement

100

What are the names of the three virtual environments?

DEV, TEST, PROD

100

What comes first? UAT, BVA, SIT

SIT then BVA then UAT

200

How many BCEHS sites are there? (not including RECC)

4

200

Name 2 people from our team who live in Alberta or Vancouver Island

Magni, Ayo, Elliott, Maitri

200

ESInet

ESInet means the Emergency Services Internet Protocol network

200

Is E-Comm a Primary or Secondary PSAP?

Both, E-Comm has both Primary and Secondary PSAP functions.

200

E-Comm BVA start date

New Dates: 2024-05-27 to 2024-06-14

300

How many RCMP sites are there (excluding North Vancouver)?

8

300

True or False, is Ed's full name Edward?

TRUE

300

ESWG

Emergency Services Working Group (ESWG)

300

Who is the BA responsible for Monitoring and Alerting?

Elliott

300

What is the day of the week that most of our go-lives are scheduled?

Tuesday

400

What is the main difference (hardware-wise) between the physical and remote builds?

3 UCS Servers

400

Most likely to be accused of wearing a kilt from time to time

Tylor

400

ANI/ALI

The ANI/ALI (Automatic Number Identification / Automatic Location Identification)

400

Name all 9 Project Managers

Zain, Tylor, John, Magni, Heather, Ed, Bharati, Azim, Christina

400

Which CP will be going first in their Go-Lives?

RCMP

500

After physical hardware is installed, what are 2 post-install activities?

SD WAN Connectivity, CP LAN connectivity, Firewall Rules setup, CAD Integration, (Eventide Integration), Remote Configuration of Survivable Site, Testing of CHS, Quality of Service Testing

500

Who from our NG team used to be a molecular biologist?

Christina

500

SIP Trunks

Session Initiation Protocol (SIP) trunking is the digital method of making and receiving phone calls and other digital communication over an internet connection.

500

Name 2 new tools being introduced to E-Comm

Prometheus, Grafana, Elastic Search, Pager Duty, Nectar, NICE Inform Health Manager

500

RCMP UAT Dates (months only unless you want to show off!)

RCMP UAT is Aug (July 29-Aug 30)

M