Review stage which examines design and technical aspects of a proposed development to ensure compliance.
What is; a Site Plan Application Process
If your street is due for resurfacing, you will receive this - indicating when work will take place on your street and who to contact if you have any concerns.
What is; Notice of Construction Letter
A program for the City during the spring and summer to keep roads and sewers clean
What is; Street Sweeping
These City staff ensure that construction is performed according to the approved drawings and established standards.
What is; Inspector
A brass plaque embedded into a concrete cylinder that sits flush with the ground.
What is; a horizontal control monument
This document is where Consultants providing Capital Engineering drawings will find the Engineering Standards to which they must comply.
What is; Capital Design Procedures Manual.
Soon to be an iconic gateway building that will offer a new central library, a downtown transit terminal and office space. It will be a landmark for train passengers entering or departing the city from the Brampton GO station.
What is; the Centre For Innovation
The program where staff use GIS help to create a series of maps with up-to-date information to assist the City's operations department in achieving high Levels Of Service.
What is; Winter Operations
… (or Snow Clearing/Winter Maintenance)
These City staff work to capture asset information and assist program planning with collecting details on deficiencies and repairs.
What is; Field Maintenance Technologist
Also referred to as a “benchmark,” this type of a brass plaque is often located on private property.
What is; a vertical control monument
This entity ensures that detailed designs are prepared with input from government agencies, conservation authorities and utility companies and meet regularly to discuss common design and construction blocks, coordinate project issues and approve municipal consent applications.
What is; Public Utility Coordination Committee (PUCC)
The next step, once all of the Developer's obligations are complete and new subdivisions are constructed in accordance to the agreements and approved drawings.
What is; Recommend the assumption to Council
The system that captures and records images only of vehicles travelling in excess of the posted speed limit in school and community zones, with tickets issued to the registered plate holder regardless of who was driving.
What is; Automated Speed Enforcement (ASE)
This maintenance program takes place every spring and summer, and involves grinding, repaving and restoration- to its original state.
What is; Road Resurfacing
This platform features initiative driven tools that help grow transparency and foster innovation everywhere, utilizing datasets and analysis through the use of maps charts and graphic visualizations.
What is; GeoHUB
This resource provides minimum design standards for all developers and builders planning, designing and constructing new communities in Brampton.
What is; Development Design Guidelines (DDGs)
Requirement for any work done on City of Brampton streets or right-of-way.
What is; A Road Occupancy & Access Permit.
A key building block for Brampton’s future management of its infrastructure assets, this report addresses the challenge of increased demand for public services while acting as a companion document to the Corporate Asset Management plan.
What is; State of Local Infrastructure (SOLI)
When it comes to keeping large infrastructure safe, such as bridges, experienced professional engineers and inspectors must follow the guidelines in this document.
What is; Ontario's Structure Inspection Manual (OSIM)
This 'bird in the sky', is known as Capital Works ROV/Drone that assists surveyors to capture aerial photography, construction layouts and quantity measurements.
What is; Eagle One
In order to receive this, an Environmental Implementation Report (EIR) or Master Environmental Servicing Plans (MESP) as appropriate, must be prepared to the satisfaction of the City in consultation with the area's Conservation Authority and the Region of Peel.
What is; a Block Plan
Originating back to 2006, the planning for this project began with a need for six-lane widening and a new noise wall. Recently Option 4 has been approved by Council (Nov. 2020) and currently a detailed report is in motion (Spring 2021), while the work is set to carry out in co-ordination with Region of Peel and MTO between 2021-2024.
What is; Williams Parkway Redevelopment
An implementation framework for network plans, policies and programs that support the 2040 Vision, including proposed dedicated cycling infrastructure for utility corridors, parkland and most of the City's arterial and collector roads.
What is; the Active Transportation Master Plan (ATMP)
A commonly used benchmark that rates the condition of a bridge by evaluating and rating its subcomponents, such as foundations, piers, deck structure, sidewalks/curbs/median, abutments or side walls, railings, etc.
What is; Bridge Condition Index (BCI)
An interactive mapping tool, used to view monument locations, records and other control point information.
What is; Active Control Reference Index System (ACRIS)