Safety & PPE
Containment
Extraction
Materials
Final & Docs
100

•What must be worn before entering the home?

•Shoe covers

100

•What pressure must containment be under?

•Negative air pressure

100

•What must be applied before extraction?

•Antimicrobial

100

•Are porous materials restorable?

•No – they must be removed

100

•What must be signed before leaving?

•Work authorization

200

•What respirator options are approved?

•Full-face OR Half-face respirator with safety glasses

200

•What pressure must containment be under?

•Negative air pressure

200

•Name one approved extraction method.

•HEPA extraction unit or truck mount

200

•Name one material that must be removed.

•Gypsum wallboard, insulation, carpet & pad, MDF, etc.

200

•What system must documentation be completed in?

•Mitigate

300

•What must be established before demolition?

•Containment and negative air

300

•What area must be outside containment?

•Don/Doff Clean Zone

300

•What must be applied after extraction?

•Second disinfectant application (proper dwell time)

300

•If unsure about removal, what do you do?

•Call the Project Manager

300

•Who must be called before leaving site?

•Project Manager

400

•What boots are required during Category 3 work?

•Rubber boots

400

•What must be done to HVAC vents in affected areas?

•They must be sealed

400

•What protects unaffected areas from hose contamination?

•Lay-flat hose protection

400

•What wood-based materials must be removed?

•Particleboard or MDF


400

•What must be completed before containment is removed?

•Final HEPA vacuum and PM approval

500

•If the work environment feels unsafe, what must you do?

•Stop work and contact the Project Manager or Mitigation Manager

500

•What is the primary purpose of negative air?

•To prevent cross-contamination and control contaminant spread

500

•What must always be followed when applying disinfectant?

•Manufacturer label dwell time instructions

500

•Name one HVAC-related material that must be removed.

•Internally lined duct board or external duct insulation

500

•What must be complete before leaving the job site?

•All documentation (notes, photos, Mitigate)