Proj Conception
Procurement
Design
Construction Documents
Post-Constr
100
Web based searchable database for green products based on Masterformat
What is Greenformat
100
An Example of a ___________ ______________is: "ASTM E119-07 Standard Test Methods for Fire Tests of Building Construction and Materials" (ASTM = American Society for Testing of Materials).
What is a reference standard?
100
On construction drawings, graphic abstractions of items and materials used in construction, usually not drawn to a particular scale, are:
What is Reference symbols.
100
_________________are the contracts between the Contractor and the subcontractors.
What is a subcontract?
100
To ______________ means to restore victim of loss by payment, repair, or replacement
What is indemnify?
200
______________is designed to attract qualified bidders.
What is an ITB - invitation to bid?
200
The Owner, Contractor, and A/E are parties to the Construction Agreement - call a ____________ relationship
What is tri-partite relationship
200
The view of a verticle plane of the building.
What is an elevation?
200
Coverage for both bodily injury or property damage.
What is a builder's risk policy?
200
Facility managers should perform a post occupancy evaluation how long after initial occupancy?
What is "three to six months"?
300
In developing _________ __________, it can be a process involving revised estimates, value engineering, and can also be the basis of subcontracts in fast-track construction.
What are outline specifications?
300
The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the:
What are Conditions of the Contract
300
Responsibility of inspecting the work already performed is with the:
What is the A/E?
300
Architect lead, Contractor lead, and Joint venture - single company, is an example of what type of delivery?
What is Design-Build?
300
When an outside participant is employed by the Owner to oversee and administer the project, this position is known as:
What is an owner's representative?
400
Publice projects general forbid the use __________ specifications.
What is "closed proprietary"?
400
The third part of the Three-Part SectionFormat is:
What is Execution?
400
These items are generally not to scale on a drawing.
What is Legend? What is key plan? What is a schedule?
400
The requirements for Contractor to install Owner furnished products should be included in:
What is Division 01.
400
When the Contractor considers the Work to be substantially complete, it is the Contractor's responsibility to submit to the Architect/Engineer a:
What is a punchlist (or list of items to be corrected or completed).
500
The "mood" recommended for specifications:
What is imperative mood?
500
Under the AIA A201 and EJCDC C-700, who provides property insurance covering the Work?
What is The Owner?
500
Mulitiple prime contracts are normally part of ______ _______ construction.
What is fast-track.
500
These use Masterformat (list two)
What is Project Manual? What are specifications? What is costing or cost classifications?
500
The Contractor, during foundation excavations, uncovers a large telephone trunk line. The line is NOT located on the construction documents. The Contractor should:
What is notify the Owner and continue with excavation in areas unaffected by the trunk line.