Risk assuming 100k units due out and 200k units of capacity.
What is 50%?
The target buffer (Min or Max buffer depending on WIP) assuming Single Large has a target min and max buffer of 45 - 60 units per packer, 10 packers, and WIP is HIGH?
What is 600?
The info a FL needs to make an informed decision on any downtime/ jams.
What is estimated downtime, current impact and TT?
The frequency with which we need to review Alphonse. (not in power point)
What is every 15 minutes?
The time in when you pull the next CPT for PSP1.
What is X?
(dont forget SLAM PAD/ daylight saving)
this is worth 500 points
Risk threshholds for TRB for YVR4. (look it up)
What is X, and X?
The Trans TUR if pick cap is at 50k, pack cap is at 38k, and WIP is 2.5k high.
What is 14.5k?
The time frame that we consider/ begin preparing unplanned closure SW.
What is 6hrs?
The reason code(s) needed for when, site is experiencing a conveyance down in flat sorter and CTC in AFE pack side by a delta of 10, and 1/2 of SP left to for the super bowl.
What is MHE? (Mechanical Hardware Event)
The individual needed to approve post pick cancellations.
What is CF OPS manager?
This AA approves/ proof reads your COES
What is TL?
Frequency that a flow lead should be validating Lagrange.
What is every 15 minutes?
The order in which we stand down OB dept'.
(15 min ETA+ SEV)
What is NEVER stand down pack before pick?
The HC to the current plan that PSP1 is on.
(induct/induct/SM/SS/SP)
What is X/X/X/x/x?
The excluded Process Paths in PSP1.
What is PPSingleWrap ?
COE stands for...
What is Correction of Error?
Target WIP for AFE1 assuming AFE 3.0, HCs of 6/20/60 Induct/Rebin/Pack, min and max buffers of 400 and 480
What is 2,400 to 2,880?
FL are required to know SW to every situation.
What is False
The number of categories available for COE.
What is Execution, LSE, Planning, RME Controllable, Software/systems, Transportation?
What is "Volume, Labor Hours, UPH, TPH, Total Pick Headcount, Process Path Units Per Hour, Process Headcount ,Buffer Size ,Shift Notes (Flow Lead Inputted)y, Headcount Accuracy, Rate Accuracy, OB Staffing to Plan, ICQA Staffing to plan, ExSD Misses, Backlog Plus Charge Ratio."
The thresholds for COEs.
What is:
AR Sortable: 500 units for a single CPT, OR 500 units over a single interval.
•ARNS: 100 units for a single CPT, OR 400 units over an entire shift.
•TSSL: 200 units for a single CPT, OR 200 units over a single interval.
TNS: 50 units for a single CPT OR 200 units over an entire shift.
The first rule of Flowperdy.
What is Jose makes the rules?
(this question is worth 100)
FL are responsible to assign re-decides.
What is 'False.
The SLAM PAD time for PSP1.
What is 60 min
The deviation HC must be for replanning SW.
What is 3%