Risk Management (and math)
WIP management (and math)
CF standards
Online tools
Miscellaneous
100

What defines a “High Pick Risk” in OSP under “Scheduling Risk”?

What is Number of picks expected to be picked between mid-Pick to Truck time and SLAM SLA (> 50% ch

100

OSP risk utilizes what time frame when calculating pick risk?

What is Time_from_plan_generation_to_Max_Pick_to_Truck_time.

100

How many rally points do we have in AZA3 in a fire drill?

What is 1?

100

The frequency with which Autoflow updates TURs.

What is every 15 minutes?

100

What feature of OSP is responsible for managing low BL labor decisions?

What is Excess_Labor_Detection

200

What is TRB?

What is Tiny red button  automated mechanism to incorporate fulfillment center (FC) risk into Promise

200

AutoFlow is currently keeping WIP in several process paths at minimum buffer.  Your site has requested that you increase WIP (utilizing buffers) as they have packers OOW. What should you do?

What is Check pick cap is site is currently at pick ask

200

Do we still call the hotline if we entered PTO for half the day we are absent?

What is yes 1 hour before your SOS

200

When actual versus planned Total HC deviates > x, we generate a new OSP plan.

What is 3%

200

What is Auto Load Balancing?

What is An_automated_software_that_applies_a_small_artificial_cost_offset_to_make_affected_CPTs_appear_less_favorable?

300

 Your site has requested a what-if due to cross training constraints.  Recognizing that this is now the 3rd period in a row that this request has been made, you may submit this what-if without approval.

What is False

300

SL currently has 20 packers with a planned rate of 100. Current backlog for the path is 4K in PNYP with 2K in PNYP HardCapped. How many hours of pickable backlog is there for the path? How many SL packers would be required to maintain 2 hours of work (always round up HC)?

What is Site has 1 HoW. 10 packers

300

Your site for the last week has been 97%-100% on PDP planning according to the production controller reports.  They have requested that you increase the headcount on the PDP by 10 associates in each quarter for their PDP.  What should you do?

What is TL/AM approval for Over hc from OSP roster

300

When planning for new hires, what % of rate do we use for Day 1, Day 2, and Day 3?

What is 50/60/70

300

What is the acceptable percentage variance when processing to backlog?

What is 5%

400

When updating SERA, what information is needed?

What is PDP,PSP, Periods/quarters, TT, TRB, misses CE/Trans

400

Your site has reported that due to weather issues they will be closing for > 8 hours. Which of the following is the correct way to override Lagrange?

What is Zero out LaGrange during closure window

400

What information is needed to generate a cross training what if?

What is a max hc for path affected and when cross training can occur.

400

Pick throttle can be engaged with AutoFlow disabled?

What is True

400

Which of the following is the criteria to engaging Min 99?

Fewer than 5 chutes open per active wall

500

The AR site you are running has one floor down and is expected to be down for greater than 6 hours, what process should be fol

Manually engage TRB, drop SEV2 ticket to AFT to flip inventory to pending research

500

AFE1 is currently sorting at 1050 average UPH per wall and running 8 walls (AFE 3.0), AFE1 is packing at 160 average UPH. The site is requesting to staff no more than 5.5 packers per wall; is this enough to balance sort to pack? If no, how many HC is needed to balance? Round up from any decimal HC.

No. site needs +8 (52 packer)


500

What is the Escalation matrix for internal CF?

TL>AM>OM>Sr

. OM

500

CORA consumes data from two sources for the risk calculation, what are they?

Rodeo, Lagrange

500

When an OSP plan is accepted and promoted, what information transfers to AutoFlow?

HC

M
e
n
u