Sec 701
Sec 702/703
Sec 704
100

In what instance would a dwelling unit not be required to have an independent connection to a public sewer. 

when stacked vertically (above and below) i.e apartments. AC-701.2.1

100

This category of drainage must be completely separated from a buildings sanitary drainage system and be treated before discharging into it.  

Chemical waste systems

100

The minimum slope for pipes 3 inches or less in diameter is ____, the minimum for pipes 4 inch or larger is ____ to create a flow velocity of at least ____ feet per second.

1/4 per foot for 3" and under

1/8 per foot for 4" and greater

flow velocity at least 2 feet per second.

AC-704.1

200

A public sewer is available for connection to a Qualifying Premises if located within ___ feet if the sewer was built after 1994, and ____ feet if the sewer was built before 1994 

250' if built after 1994, 150' if built before 1994

AC-701.2.2

200

this is required when a building storm sewer is connected to a public combination sewer.

a controlling trap

AC 703.1.1

200

what is the minimum distance from finished floor to the flow line of an underground horizontal building drain when inside the building

12" finished floor to flow line or greater.

AC-704.1.1

300

Is required on all newly constructed or replaced sanitary or combined sewer laterals when connected to public sewers.

an inspection/site tee at or near the property line.

AC-701.2.3

300

True or false: separated sanitary and storm drainage systems may be laid side by side in the same trench.

true

703.3

400

wastewater when discharged from a steam exhaust, blowoff or drip pipe into the building drainage system shall not exceed ____ temp and cooled by an approved method.

140 degrees F

701.7

500

where shall exposed soil or waste piping not be installed.

above any working, storage or eating surfaces in food service establishments. 

701.9