construction
Channel Tunnel
transport
Varia
100

What year did they start constructing the Channel Tunnels

1988

100

What two countries are connected by the Channel Tunnel 

The United Kingdom and France

100

What to they use to travel through the tunnel

High speed passenger trains

100

who was the first to propose to build the tunnel under water

Albert Mathieu-Favier

200

How much did it cost to build the Channel Tunnels

9 billion (equivalent to 22.6 billion in 2023).

200

How long is the Channel Tunnle

50.45km

200

How long it takes to travel through the Channel tunnel

35min

200

what was the  material that was excavated through

chalk

300

How deep undeer water is the Channel Tunnel located

75m

300

What year did the Channel Tunnle open

1994

300

How many trains go through the Channel Tunnels every day

350

300

Who promoted to build the Channel Tunnel

William Low and Sir John Hawkshaw

400

What did they use to build the Channel Tunnels

 Tunnel boring machine

400

Who operates the Channel Tunnels 

Getlink

400

what is the speed limit on the trains

106km/h

400

What kind of problems did they have when building the Channel Tunnel

Fires, tunnel kraks, water leakage

500

How many people were hired to work on the Channel Tunnel

15 000 

500

Who was the first passenger on the Chnnel Tunnel

Quuen Elizabeth the second

500

in 2017  how many passengers went through the Channel Tunnel

10,3million

500

How many fires where in the Channel Tunnels

3