How long did it take to build the Channel Tunnel?
It took 6 years to build
How fast does the Eurostar travel through the Channel Tunnel?
The Eurostar travels through the Channel Tunnel at a speed of 100 miles per hour (160kph)
How long is the Channel Tunnel?
The Channel Tunnel is 31.5 miles long or 50.45 km
Can you see the sea from the Eurostar at some point?
No, you can't see the sea from the Eurostar at all
How much did the project cost?
It cost 4.65 billion pounds
Who can travel through the Channel Tunnel?
Foot passangers can travel with Eurostar
How deep is the Channel Tunnel? (below the sea level)
The tunnel is 75 metres below the sea level
In what language was once the train design, track design and the signalling system?
It was all in French
When did the construction of the Channel Tunnel begin?
The construction was started in 1988
When did the Eurostar services start?
Eurostar services started in 1994
In what year was the Channel Tunnel completed?
It was completed in 1993
Is there Wifi in the Channel Tunnel?
Yes, 4G mobile services are available in the Channel Tunnel
What machines were used to build the tunnel?
Tunnel boring machines were used
Who was the first official passenger to travel through the tunnel?
The Queen was the first official passenger
In what year and month was the tunnel officially opened?
It was opened on May, 1994
What's the difference between Eurostar and Eurotunnel?
Eurostar and Eurotunnel are completely different companies but they share use of the Channel Tunnel
How many workers helped to build the tunnel?
13.000 workers helped to build Channel Tunnel
How long are you underwater on the Eurostar?
It takes 35 minutes for Eurostar to cross the 23-mile underwater stretch of the Channel Tunnel.
What are the tunnel walls made of?
The walls are made of reinforced concrete
Why was the cab window made very small?
Cab window was made very small so the driver wouldn't have a hyptonic effect