What is The Channel Tunnel
Facts about its construction
Facts about its transport
Other Facts About The Channel Tunnel
100

What two countries are connected by The Channel Tunnel?

The United Kingdom and France.

100

What year did The Channel Tunnel start construction?

1988

100

What do they use to travel through the tunnel?

high-speed passenger trains

100

What did they use to Dig The Channel Tunnel?

Tunnel boring machines

200

What are the two towns that are connected with the channel tunnel?

Folkestone and Coquelles.

200

What is The Channel Tunnels lowest point below sea level?

115 meters

200

What is the speed limit for the trains travelling through in kilometers per hour?

160 km/h

200

What kind of mechanical problems has The Channel Tunnel faced?

Fires and cold weather.

300

What company owns and operates The Channel Tunnel?

Getlink
300

How much did  The channel Tunnel cost to build?

£9 billion (equivalent to £21.8 billion in 2021)

300
How long does it take to travel in The Channel Tunnel?

35 minutes

300

What year did cross-tunnel passenger traffic volumes peak?

In 1998
400

How many kilometers long is The Channel Tunnel?

50.46 kilometers

400

How many people were employed at the peak of The Channel tunnels construction?

15000 people

400

In 2017 How many passengers travelled through The Channel Tunnel?

10.3 million

400

How many tunnel boring machines did they use?

eleven

500

What year was The Channel Tunnel opened?

1994

500

What was the daily expenditure at the peak of The Channel Tunnels construction?

over £3 million

500

On average how many trains run through The Channel Tunnel each day?

350

500
How many fires have been in The Channel Tunnel?

three

M
e
n
u