100

Macro-motion Studies _________

Micro Motion Studies __________

The overall flow of the entire factory

smaller, more detailed studies of operations within the factory

100

All processes can be broken into 5 Classes:

O.T.I.D.S.

Operations 

Transportations

Inspection 

Delay 

Storage

100

Improvement Sequence: 

Can the activity be _______

can the activity be _______

can the activity be _______

can the activity be _______

1. eliminated 

2. combined

3. rearranged 

4. simplified 

100

Internal work is work than can

be performed during the machine cycle


100

External work is work that 

must be performed while the machine is stopped

200

Value added work  is 

An activity that physically changes the part to meet custom requirements 

200

What percentage of manufacturing time is non-value added 

85-95%

200

What is Time standard

The time required to produce a product by a qualified, trained operator working at a normal pace, doing a specific task

200
What is TAKT time? 

Is the required time to produce a part to meet customer demand based on the work time available 

200

What's the equation for TAKT time?

(Shifts x (work hrs - breaks- startup- end of shift))/Demand (pcs/day)

300

Equation for amount of machines needed

Time Standard (min/unit) / TAKT time (min/unit)

300

Manpower equation

Labor standard x Requirements (pcs)

300

What is the measure of productivity?

OUTPUT/INPUT

300

Efficiency equation 

earned hours/actual hours

300

earned time equals 

hrs/pc X pcs produced

400

What does PDCA stand for 

PLAN 

DO

CHECK

ACT

400

What is cycle time?

How long it take to produce a part from start to end of process

400

Plants with no standards operate at _______

Plants with Standards operate at _____

Plants with Incentive Programs operate at _____

60%

85%

120%

400

Lower efficiency gives  _______

Higher efficiency gives _______

More Labor 

Less Labor 

400

Lead time is the time is takes to...

A. get through all processes from start to finish, including all operations and wait times 

B. buttfucking a corpse because its thursday 

A.

500

what does a push system do 

calculates the amount of finished goods needed and quaility losses

500

what does a Pull system run 

J.I.T. philosophy reduces finished goods; parts are produced as needed in perfect conditions

500

2 shifts, 10 hr shifts, paid lunch 30 min, start up 10min, shutdown 10 min

customer demand 600 pcs/day

solve takt time