Safety
Acronyms
NBIT
BBIT
Interactive Built In Test
100
Everybody is responsible for this.
What is safety?
100
Chassis Modernization-Embedded Diagnostics.
What is CM-ED?
100
The acronym for Non-Interactive Built-in Test.
What is NBIT?
100
BBIT stands for this.
What is “Background Built In Test”?
100
IBIT is the acronym for this.
What is Interactive Built In Test?
200
A word that is said before turning on power, moving the gun,tow launcher or turret.
What is clear?
200
It contains switches and lights needed for basic operations of the M2/M3A3 fighting vehicle.
What is the Drivers Switch & Indicator Panel?
200
This test is run before the Non-Interactive Built-in Test.
What is SBIT?
200
Once NBIT it completes, this runs.
What is BBIT test run?
200
It checks for malfunctions that SBIT, NBIT, BBIT are unable to detect.
What is IBIT?
300
Before working on a Bradley Fighting Vehicle, some people remove these.
What is Jewelry, ID Tags, Watches and Rings?
300
A flat screen display in front of the driver.
What is the (DTD) Drivers Tactical Display?
300
This is supposed to run for 120 seconds before it is complete.
What is NBIT?
300
This test is continuously repeated.
What is BBIT?
300
A person responsible to select the proper subsystem test.
What is a maintainer?
400
Worn around running engines.
What is hearing protection?
400
A test that is run on the DVDB, SLD and the DTD when the master power is turned on.
What is the SBIT (Startup-Built-in Test)?
400
This display will inform you of 100% complete test.
What is the CTD (Commanders Tactical Display)?
400
A test to monitor the Health/Stability of the system.
What is the BBIT test?
400
To fix faulty system and subsystems.
What is The primary role of a maintainer?
500
“Beep Horn” ” wait for response of “Clear” then and wait 5 Seconds before starting.
What is The procedure for starting the engine?
500
FBCB2 is an acronym for this.
What is Force XXI Battle Command Brigade and Below?
500
These perform functional checks on Hardware/software and Input/output Ports.
What are LRU's?
500
BBIT displays a failure Handling pop up Identifying the fault.
What is What happens when a fault is found during a BBIT test?
500
The last thing the maintainer does after fixing the fault is.
What is a verification test?
Continue
ESC
Reveal Correct Response
Spacebar
M
e
n
u
Team 1
0
+
-
Check on Learning
No teams
1 team
2 teams
3 teams
4 teams
5 teams
6 teams
7 teams
8 teams
9 teams
10 teams
Custom
Press
F11
Select menu option
View > Enter Fullscreen
for full-screen mode
Edit
•
Print
•
Download
•
Embed
•
Share
JeopardyLabs