Radiation
Environment
Safety
Acronyms
Cigar Lake Objectives
100
All NEW's must wear this.
What is an OLSD Badge?
100
the acceptable range of this is 6.5 to 6.8
What is pH?
100
This request is the start of every morning tool box meeting.
What is a safety share?
100
JBS
What is Jet Bore System?
100
The total amount of packaged pounds of ore Cigar Lake plans to produce for 2015
What is 11 million?
200
A device to monitor daily worker exposures in elevated gamma fields.
What is a DRD ( Direct Reading Dosimeter )?
200
A high level of this will cause a water advisory?
What is Turbity?
200
This group meets daily after the tool box meeting to review incidents entered into CIRS.
What is CAG
200
CNSC
What is Canadian Nuclear Safety Commission?
200
Number of reportable spills for 2015
What is 5?
300
The risk associated to a hazard with no controls.
What is Inherent Risk
300
The number of litres of spilled gasoline in a 24 hr period to be classified a reportable spill?
What is 500 litres?
300
all non-routine work requires this safety practice before starting.
What is a JHA?
300
ALARA
What is As Low As Reasonably Achievable?
300
The TRIR goal for 2015
What is 1.60?
400
The gamma exposure rate, once reached, requires you to notify your supervisor and radiation department.
> 50 uSv?
400
Recycling falls under this program?
What is Waste Management?
400
CIRS reported approx 187 of these incidents in 2014?
What are near misses?
400
P&ID
What is Piping and Instrumentation Diagrams?
400
The DART goal for 2015.
What is 0.6?
500
These 4 elements of Radiation are continuously monitored on site.
What is Gamma Radiation,Radon Progeny, Long Lived Radioactive Dust and Radon Gas.
500
By year end, our environment program will be certified to this international standard.
What is ISO 14001.
500
Each Cameco front line worker and contractor who is temporarily filling a regular Cameco position must be involved in at least one of these per quarter.
What is a Job Task Observation ( JTO )
500
BSLRA
What is Business Screening Level Risk Assessment?
500
Current cycle time target for the jbs
What is 9 Days?
M
e
n
u