Quality
Change Orders
Project Documentation
Buying Out the Project
Potpourri
100

Repeatable process

What is a key tenet to quality

100

The requires signatures on a bilateral change

Who are the owner and the contractor?

100

Drawings of all the MEP trades shown on one set of drawings.

What are coordination drawings?

100

This type of contract clause can require that a sub-contractor has the same insurance as the prime contractor.

What is a pass-through clause?

100

The critical element in buying out the project.

What is the scope?

200

Thinking tool to help analyze possible causes to a problem.

What is a fishbone diagram?

200

The type of change order that is the result of this type of mistake by the design professional

What are error and omission?

200

Items we can typically bill 100% for with our first application for payment.

What are bonds and insurance?

200

Upon the successful completion of the construction project when all bills have been paid and the contract is fulfilled, the contractor will request from the bonding company a _____________ to free up their bonding capacity.

What is consent of surety?

200

The entity with the lowest bid at the time of bid opening.

What is the apparent low bidder?

300

For a project, quality starts in this phase.

What is in design?

300

An owner directed change order to change the scope

What is a program change?

300

Place where I write my daily personal notes about the project.

What is a daily diary?

300

When a general contractor discloses a subcontractor's bid price to another subcontractor with the intention of seeking a lower price.

What is bid shopping?

300

Site conditions that vary from those shown on the drawings.

What are differing site conditions?

400

In lean, this waste is characterized by unnecessary movement.

What is a motion?

400

A change order that does not affect time or money, such as adding a new form to the contract.

What is an administrative change order?

400

These would inform the owner and design professional as to what specific pump the HVAC contractor is buying.

What are catalog data sheets or catalog cut sheets?

400

The process of meeting with all our trade partners to verify/confirm the scope that is contained in their proposal.

What is bid leveling?

400

Contractors are entitled to either of both of these on a change order.

What are time and money?

500

Experienced people, not associated with the project going over the drawings and specifications for errors, omissions, code violations, constructability issues and other non-conformances.

What is design review?

500

The financial loss of the owner for a delay in delivering the project.

What are liquidated damages?

500

These contain the maintenance and operating requirements for equipment.

What are O&M Manuals?

500

This document is used to procure supplies and materials only. 

What is a purchase order?

500

This type of clause prevents a contractor from asking for additional time when a change order is executed, but it took longer than expected.

What is no damage for delay clause?