100

SWPPP

Storm Water Pollution Prevention Plan

100

OSHA

Occupational Safety and Health Administration 

100

What is design build construction?

A general contractor manages the construction part of a building project. It is provided with the design and then plans appropriately to complete the physical work of those plans according to code.

100

Division 4

Masonry

100

What is the difference between a general contractor and a subcontractor?

A general contractor is the contractor with main responsibility for the construction, improvement, or renovation project under contract, and is the party signing the prime construction contract for the project. A subcontractor is a company or person who is hired by a general contractor to perform a specific task as part of the overall project and is normally paid for services provided to the project by the originating general contractor.

200

RFI

Request for information

200

USGBC

U.S. Green Building Council

200

Define construction manager at risk.

The Construction management at-risk (CMAR) delivery method is an alternative procurement process similar to long-standing private sector construction contracting. CM at-risk is a cost effective and time conscious alternative to the traditional design-bid-build process.

200

Division 7

Thermal and Moisture Protection

200

What is the actual size of a 2 x 12?

1-1/2" x 11-1/4"

300

IBC

International building code

300

ANSI

American National Standards Institute

300

What is the design-bid-build?

Design–bid–build is a traditional method or hardbid, that is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.

300

Division 31

Earthwork

300

What is concrete made of?

Cement, Water, Aggregates, and admixtures.

400

ADA

American Disabilities Act

400

ASCE

American Society of Civil Engineers

400

What is a public private partnership (P3)?

P3 is a cooperative arrangement between two or more public and private sectors, typically of a long-term nature.

400

Division 11

Equipment

400

What is the difference between design build and design bid build?

Design-bid-build (D-B-B) is a method of project delivery that involves the owner or agency contracting different entities for design and construction. Design-bid-build (D-B) is another form of project delivery that involves the owner or agency contracting one entity for design and construction.

500

MS4

Municipal Separate Storm Sewer System

500

CSI

Construction Specifications Institute

500

Define Engineering, Procurement, and Construction. (EPC)

Engineering, procurement, construction and (EPC) contracts are the most common form of contract used to undertake construction works by the private sector on large-scale and complex infrastructure projects.

500

Division 14

Conveying Equipment

500

What is a FROG?

The depression provided in the face of a brick during its manufacturing.