SOG 400 Series
CBA
NSAB Knowledge
Engine Co. Ops
SOG 100 Series
100

The SOG# relating to Active Shooter.

BONUS (100pts): Minimum number of personnel required to complete an RTF. 

SOG 408


BONUS: 2EMS/2Police

100

The amount of time authorized to relieve someone early

59 minutes

100

Location of fire pump in building 19

C side, near north well of building 1

100

The location, and length of each attack line on E750, the nozzle on each line. 

bumper 150', 1.5", 75/150

crosslay x2 200', 1.5", 75/100

rear 400', 1.5", 75/150

rear 300' (currently 250'), 2" smooth bore (1-1/8, 50/265)

100

The NDWF&ES Vision Statement

"Protecting those who defend America"

200

The SOG# for "Mayday Alert Procedure."

The procedure for calling a MAYDAY.

SOG# 404 // Who, What, Where, or LUNAR

200

The timeframe in which a trade should be submitted

not normally less than 24 hours

200

The building numbers and letter associated with the USUHS complex

70 (a), 71(b), 72 (c), 74 (d), 76 (e)

200
The first (and arguably most important) step a driver should complete on a fireground

positioning

200

The SOG related to Govt Vehicles 

104, are you allowed to get groceries with a govvie?

300

The SOG# for Structure Fire Response and the engine company responsibilities

SOG 405,

1st - Water supply, size up, 360, tact command, attack group

2nd - Complete primary water, back up line
3rd - RIT

4th - Secondary water, side C report

5th - Complete secondary, back up 4th

(what is different in MOCO vs NDW SOG, +200 points)

300

The amount of time management is required to respond when requesting leave

4 hours if within pay period, 2 calendar days if outside pay period

300

FDC and hydrant location of building 64

B side, near hospital MCI bus. Plug across the street from FDC.

(2 FDC's bravo side, one near steam room)

300

Current stack tip sizes and GPM associated

1-3/8: 500

1-1/2: 600

1-3/4: 800

2: 1000

300

The SOG regarding parking, the timeframe when you are allowed to wash/work on your vehicle in the bays

SOG 116, Mon-Fri @ 1600, Sat/Sun @1200

400

The SOG for Gas Leaks, number of meters required per the SOG

422, two meters 

400

The amount of "call outs" before you are required to furnish medical evidence for leave

three consecutive 24 hour tours

400

Location of all ground pads on NSAB

62, 64, fisher houses

400

The type of building that is storefront on the first floor, and apartments above it

TaxPayer

400

NFIRS SOG, timeframe for entering reports

132, Priority 1 within 4 hours, all others 24 hours.

500

The maximum BP and pulse rate allowed when assessed at rehab, according to SOG 410

160/100, 100

500

The 10 things required in a grievance


BONUS (+500): the amount of time management has to respond to a grievance

Grievant's Name

Statement of grievance

Date(s) of act(s) being grieved

Portion of CBA/regulation being misapplied

Evidence to support grievance

Person(s) involved, list of witnesses

Remedy desired

Copy of written decision from previous steps

Name of rep

Signature of grievant



BONUS: 10 days, (admiral has 20)

500

Full explanation of which buildings are fed by what in the hospital, where the shut offs are, isolation valves, etc

19, 39, 9, 1

9 - 9,9a,10, isolation in 9a basement. 

19-1 (up to 5th), 3,5,7,19,39 .. Isolation in cieling outside shop at 19, isolation between 19 and 39 in service tunnel, isolation in the ground of north well. 

500

NFPA 1500, SOG 400

2 in, 2 out 

500

Force Protection SOG, and the different levels

SOG110

FPCON Normal

Alpha

Bravo

Charlie

Delta

M
e
n
u