High Pressure
Emergency Ops
GEC Positions
Our System
Acronyms
100
A "best friend" document that calculates %SMYS, minimum and maximum test pressures, material design pressures, and is reviewed and approved by Region Engineering
What is DDS (Design Data Sheet)
100
This person is the central point of contact and oversees all field operations during an emergency incident.
Who is Incident Commander
100
Responsible for staffing the GEC and updating significant events.
Who is Process Manager
100
With it's scheduled Pigging operation occurring this year, this Transmission Line running from Santa Fe Station to Spence Street Station impacts multiple distribution facilities
What is L2000
100
MAOP, MOP, DL
What is MaXimum Allowable Operating Pressure Maximum Operating Pressure Design Level
200
If you are installing a new high pressure main, this map identifies the beginning and end locations for its corresponding test.
What is Strength Test Assemblies
200
This report is issued by the Tech Services or Engineer on-call summarizing the current events of an emergency incident.
What is MCR Engineering Summary Report
200
Responsible for providing logistic support such as food, supplies and lights; employee accountability, injury and fatality; Updates Safety Status Board, Facility Status Board and Employee Status Board in WebEOC.
Who is Business Support Rep
200
This supply line and regulator station is the primary feed into UCLA.
What is SL 43-121 / SL 37-07 Crenshaw Station
200
TG, EPM, AES
What is Terminal Gauge Electronic Pressure Monitor Autosol Enterprise System
300
A document that defines project scope, emergency contingencies and step by step procedures for installation of abandonment of High Pressure projects.
What is Gas Handling
300
This is the primary focus of our Company's vision. It is a way in which recommendations, procedures, and emergencies should always be addressed. We should always consider this before anything else.
What is Safety
300
Responsible for assisting with map gathering, incident plotting, system engineering analysis, etc. but also oversees the operations during and incident to ensure safety and procedures are followed closely.
Who is Operations Manager
300
These 3 regulator stations are the primary feeds into the "Southern Loop" system.
What is Victoria Station Crenshaw Station Inglewood and 190th St Station
300
PD, SL, TL, GPZ
What is Pressure District Supply Line Transmission Line Gas Pressure Zone
400
This online database archives electronic scans of all high pressure documentation once it is has been approved and reconciled.
What is PDMS (Pipeline Data Management System)
400
Our recommendations are most often an attempt to minimize customer impacts. This is one recommendation that Region Engineering proposes to maintain the flow of gas for a temporary period of time while permanent repairs are complete.
What is Temporary Bypass
400
Responsible for the GEC overall operations, prioritizing safety in the GEC and periodic conference calls between the Region Department Heads, LA-EOC, and Incident Commander (IC)
Who is GEC Director
400
This area is always threatened by storms and natural water events. It's one-way feed is crucial to maintaining 5,000-6,000 customers.
What is The Grande Bulge Malibu/PCH SL 37-04
400
MSA, FSR, RS, FCV
What is Meter Set Assembly First Stage Regulator Regulator Station Fire Control Valve
500
The Operating Pressure of a system is defined as the highest pressure at which a piping system, or segment of a piping system is operated. Another form of pressure identification is the pressure at which a piping system, or segment of a system, is intended to operate based on long-term planning
What is Design Level (GS 182.0185)
500
According to Transmission written policy, if an earthquake hits our service territory and is considered to be a magnitude greater than this number, Engineering analysis is required to determine this.
What is 5.0 ---------------------------------------------------------------- Safety and reliability of our pipeline system and facilities OR survey radius
500
Responsible for updating the incident MCR every 2 hours or as necessary, working closely with the CCC, coordinating restoration efforts, and allocating necessary employee resources
Who is Customer Services Manager
500
Name 3 of the PSEP lines currently scheduled for replacement in 4th qtr 2015 or early 2016.
What are SL 37-07 SL 30-18 SL 37-18 SL 37-18-F SL 43-121
500
OEM, GEC, TCP, EOC
What is Operations Emergency Manual Gas Emergency Center Transmission Command Post Emergency Operations Center
M
e
n
u