THIS SHALL BE WORN WHEN WORKING IN HEIGHTS ABOVE 4 FEET.
What is A FALL HARNESS
100
THIS IS THE LOCATION DESIGNATION OF THE CONTROL FUSE ON THE LPV700.
What is F100
100
TO COUNTER THE EFFECTS OF ANY LOSS OF A POWER OUTAGE THE FACETS OF MULTIPLE BACK UP SYSTEM ARE USED.
What is "REDUNDANCY"
100
THIS IS THE AMOUNT OF TIME IT TAKES TO STAGE 1 TRAILER MOUNTED UNIT.
What is 30 MINUTES
100
COMPANY STARTED IN THIS YEAR
What is 1997
200
HEARING PROTECTION SHOULD BE WORN WHEN WORKING ABOVE THIS DBA LEVEL
What is 84 Dba
200
THIS SHOULD BE YOUR FIRST CHECK WITH A METER WHEN DOING ANY TESTING OR TROUBLESHOOTING ON A UNIT
What is GROUND FAULT CHECK
200
USING APPROX 76 BILLION KILO-WATTS FOR NETWORKING, FILE STORAGE, FILE SHARING, TELECOMMUNICATIONS, THESE INDUSTRIAL SCALE OPERATIONS GENERATE OVER 50 PERCENT OF CRI REVENUE.
What is B) DATA CENTER
200
THIS IS THE AMOUNT OF TIME IT TAKES TO LOAD AND UNLOAD A 922
What is 2 HOURS
200
THIS IS THE BIGGEST COMRENT TEST IN THE HISTORY OF COMRENT.
WHAT IS 50 MW, 13.8KV @.08 PF.
300
CARDIOPULMONARY RESUSCITATION CONSIST OF THESE 2 MAIN PARTS __ __.
What is A) COMPRESSIONS, B) BREATHING,
300
THIS IS THE VALUE THAT SHOULD BE THE MIN WHEN TESTING POWER CONNECTIONS TO GROUND USING AN INSULATION TESTER.
What is NOMINAL VOLTAGE +1000
300
THESE ARE THE 4 TIERS OF DATA CENTER DESIGN.
What is TIER 1, TIER 2, TIER 3, TIER 4.
300
THIS IS THE POINT AT LABOR IS QUOTED LABOR IS QUOTED. 2 PART ANSWER.
What is PMAF AND WHEN SCOPE OF WORK IS UNDERSTOOD.
300
THESE ARE THE SUPERVISORS OR "LEAD" FOR EACH SHOP
What is JR, BARRY, ERIC, BRANDON, JOE R, DON, BOB, GERALD, DAVID T, RICK C, MIKE K, ART S, BLAINE, MEHRDAD, TYLER.
400
WITH THE ABILITY TO PRODUCE BETWEEN 120-200 JOULES THE ________ SERVES AS A SECONDARY EMERGENCY RESPOND METHOD TO A LAYPERSON DURING THE INSTANCE OF ______.
What is , AUTOMATED EXTERNAL DEFIBRILLATOR, CARDIAC ARREST
400
ON THE LPH400 THIS CONTACT WAS MISSING FROM THE K1A RELAY CAUSING THIS TO HAPPEN.
What is THE L2-T2 CONTACT, CAUSING B PHASE TO BE TAKEN OUT OF THE CIRCUIT.
400
THIS IS THE PRIMARY FUNCTION OF A UPS IN A DATA CENTER
WHAT IS TO MAINTAIN BUILDING POWER UNTIL THE GEN COMES ON.
400
THESE ARE THE 4 LEVELS OF SERVICE THAT COMRENT OFFERS
What is RO/RU, TECH ADVISORY, OPERATOR, TURN KEY.
400
THESE ARE ALL THE COMRENT LOCATIONS IN THE U.S. AND CANADA .
WHAT IS: OW1, 0W2, 0W3, CO1, TX1, TX2, IL1, OH1, GA1, FL1, MD1, MA1, NY1, AB1, QC1, CA1
500
INTRODUCED IN THE FOURTH CENTURY BC, THIS CONSTRICTING AND COMPRESSING MECHANISM ENABLES FIRST RESPONDERS TO MANAGE THE DIRECTIONAL OUPUT OF BLOOD TO STEM VASCULAR OCCULUSION.
What is TOURNIQUET
500
THIS US NAVY APPROACH CONSIST OF THESE 6 STEPS
What is SYMPTON RECOGNITION, SYMPTON ELABORATION, LIST OF PRBABLE FAULTY FUNCTIONS, LOCALIZING THE FAULTY FUNCTIONS, FAILURE ANALYSIS
500
THESE ARE THE 4 MANUFACTURERS OF BUS TRACK
What is STAR LINE, PDI, SIEMENS, POWER WAVE
500
THESE ARE THE 4 EXPECTATIONS PMS HAVE FOR TECHS ON THE JOBS
What is UPDATE, TURN IN TIMESHEETS, TURN IN DAILY LOGS, PROFESSIONALISM.
500
THESE ARE THE NAMES OF THE PROJECT COORDINATORS
What is LARRY B, JAMES H, RAY S, RYAN H, DEBBIE C, TIM H, MARIA K, LARS B, DAVE S, DAVID L, VINCE W, KIM L, JOE H, GABRIEL C.