ORGANIZATION
DRAWINGS
SPECIFICATIONS
BIDDING AND NEGOTIATION
BONUS
100
this person is responsible for furnishing the necessary legal, accounting, and insurance services for a project
What is the owner
100
these drawings are included in construction drawings along with site and building plans, elevations, details, diagrams, and schedules
What are section drawings
100
these describe the level of quality and standards to be met during the construction of the project
What is the specifications
100
time can be saved by eliminating the bid period when a contract is negotiated directly with this person if they are preselected
What is a contractor
100
cuddling with this childhood toy can improve your mood and decrease feelings of loneliness.
What is a teddy bear
200
the project manual and the project drawings typically come together to make up these
What are the project documents
200
the project title and address frequently including the owner's name and address are found in this part of a drawing
What is the title block
200
this presents a series of general procedural and administrative requirements applicable to all portions of the work
What is master format
200
the delivery method for a project should be decided on no later than this phase of a project.
What is the design phase
200
this fast food chain's strawberry milkshake is made using a combination of 50 different artificial flavors
What is McDonalds
300
Bidding requirements, contract forms and supplements, contract conditions, and specifications are typically included in this
What is the project manual
300
referred to as "keys" these are one of the primary methods of establishing the relationships among drawings
What are targets
300
this method of specifying describes exact characteristics of materials and products without listing proprietary names
What is descriptive specifying
300
this nontraditional method for construction can save the owner time and money
What is fast track phased construction
300
What species of primate has been known to kidnap puppies and raise them as pets
What is baboons (also humans)
400
this person is assists the owner in the bidding process, form of agreement with the contractor, and the conditions of construction contract.
Who is the architect
400
these drawing elements are included in the event that drawings are reduced in size
What are graphic scales
400
this form of specifying is frequently augmented with reference to standards, narrative descriptions of material qualities, and performance requirements.
What is proprietary specifying
400
Instruction to bidders, notice to bid, form of owner/contract agreement, performance bond, labor and material bond, etc. are included in this set of documents
What is the bidding document package
400
Panophobia is the fear of this
What is everything
500
orders for minor changes in the work, construction change directives, and change orders become a part of this
What are the contract modifications
500
this provides comprehensive guidance to users of 2 dimensional computer aided design, or CAD
What is the US National CAD Standard (NCS)
500
this technology creates a system for more tightly integrated specifications and permits them to be assigned to assemblies of objects
What is BIM technology
500
the goal of this meeting is to provide bidders with a clear and consistent understanding of the project requirements. Attendance is often required to submit a proposal.
What is a pre-bid conference
500
this well known tv game show helps people learn subject matter that is otherwise difficult to retain
What is jeopardy