Billing
Building
Documentation
Bidding
Bindustry Terms
100

This is a partial payment made to a contractor, supplier, or service provider for work that has been completed to date. It is the standard for construction billing

Progress Payment, Pay App, Requisition, AIA Req

100

Construction Specifications Institute (CSI). MasterFormat is a widely accepted organizational system that standardizes the information and specifications used in construction projects.

What are Construction Divisions

100

Term used to describe name contractors responsible for Mechanical, Electrical, and Plumbing systems within the construction and building industries.

MEP Contractors

100

Workplace or project site where union membership is not required as a condition of employment

Open Shop

100

Typically used as a slang term meaning - Start a job

Break ground

200

These forms are used by contractors to apply for progress payments and provide an itemized breakdown of work completed, making them integral to construction accounting.

AIA G702/G703

200

Formal document used to modify the terms, scope, cost, or schedule of an existing construction contract. Can be caused by unforeseen conditions, changes in design, or additional work requested by the client or other stakeholders.

Change orders

200

Document sent to ownership/architect for review and approval prior to starting a job

Submittal

200

Final proposal or bid submitted by a contractor or supplier after all rounds of negotiations have been completed.

Best and Final. Typically a call or D-Scope meeting

200

Term used to describe professionally reviewed drawings and specs

What are Stamped Drawings

300

This type of waiver serves as proof that payment has been received and cleared

Unconditional Lien Waiver

300

Allows the property owner or tenant to use the building while final details or outstanding issues are resolved.

Temporary Certificate of Occupancy - TCO

300

Set of drawings prepared by a subcontractor for review by an architect or engineer

Shop Drawings

300

Process of comparing and analyzing bids from multiple vendors, contractors, or suppliers to ensure they are evaluated on a consistent and fair basis

What is Bid Leveling

300

Name for the type of work where the basic structure of the building is completed, including the external walls, windows, roof, and sometimes elevators.

Core and Shell

400

This is filed when payment has not been received and places a legal claim on the property, which must be resolved before the property can be sold, refinanced, or transferred.

Mechanics Lien - "lien the job"

400

This party is responsible for managing and overseeing construction projects from start to finish.

General Contractor - GC

400

Formal process used to ask questions of an architect or engineer 

Request for Information RFI

400

Letter sent prior to the contract notifying a contractor that they have been awarded a job

Letter of Intent, Notice to Proceed

400

Term used to describe the construction to make a space customized for the end user. Office space, doctors office etc

What is Fit-out
500

U.S. federal law enacted in 1931 that requires contractors and subcontractors on federally funded or assisted construction projects exceeding $2,000 to pay their workers prevailing wages and fringe benefits.

Davis Bacon egg and cheese

500

Formal notice issued by a contractor, or government authority to halt work on a project. Typically due to safety concerns or regulatory violations

Stop Work Order

500

Term used to refer to drawings in the "bid phase" which are incomplete drawings typically 50-60% done

Design Development DD

500

When a project goes into rebid an costs are reviewed and scope is cut. Often called "optimization" 

What is Value-Engineering
500

What is the term used to describe accounts receivable or total amount of money owed to a contractor. 