Craftsman Corner
Bob The Builder
Hammer Time
100

It is a formal proposal to complete a project for a specific price 

A Bid

100

Part of the project closeout of the construction process in which a contractor prepares a list of work that has not been completed or has not been completed correctly

Punch List

100

An agency of the U.S. Department of Labor that creates and enforces standards to protect workers

OSHA (Occupational Safety and Health Administration)

200

A detailed plan or design that serves as a guide for constructing a building or structure

Blueprint

200

is protective clothing, helmets, goggles, or other garments or equipment designed to protect the wearer's body from injury or infection.

PPE

200

A site plan is a detailed architectural drawing that maps a building site, showing how the structure will be oriented on the lot

Site Plan

300

An amendment to a construction contract that changes the contractors scope of work

Change Order

300

Details that define the construction project’s scope, client expectations and other important information for the project.

Specs

300

a calculation of all of the required costs for a construction project, including direct costs like materials and wages and indirect costs like equipment repairs and cleanup. 

An Estimate

400

The request for clarification about documents, drawings, specifications, or other project conditions. 

RFI (Request for Information)
400

This process is crucial to ensure that the selected contractors are capable of handling the project.

RFQ (Request for Qualifications)

400

A skilled tradesman/tradeswoman who installs, maintains, and moves machinery in factories, powerplants, and/or construction sites. 

Millwright

M
e
n
u