The height at which OSHA requires fall protection for construction activities.
What is 6 feet?
What must be used to escort any equipment under overhead powerlines
A spotter
What cut level do your gloves have to be on this site
Cut level 3
When an excavation reaches this depth, cave-in protection is required by OSHA.
What is 5 feet?
A break (change) in elevation of 19" or more exists for access.
When is a ladder or stairs (steps) required?
At what distance does lighting shut down ground work
18.6 Miles
The required height range for the top rail of a guardrail system, according to OSHA.
42 (+ or -) three inches
A device typically located at the electrical panel that protects wires from overheating and thereby prevents fires but does not protect against electric shock.
What is a circuit breaker (or a fuse)?
What PPE do you need to work on this site
Hardhat, Gloves, Safety Glasses, Safety Toed Boot, Hi Vis Vest
When an excavation reaches this depth, stairs, ladders or ramps must be provided.
What is 4 feet?
Which rung is not allowed to be used when using an A frame ladder?
Top 2
What were todays safety topics
What is the maximum weight limit for someone to wear a full body harness.
What is 310lbs.
What is the minimum distance that you must stay clear from energized power lines?
What is 10 feet.
This PPE helps to keep you noticed (i.e., stand out) on a construction site.
What is Hi-Vis Apparel?
Responsibilities of the "competent person" during excavation work.
Inspect the excavation for hazards, and classify the type of soil and fix any hazards present
What is the minimum distance that a ladder is to extend beyond an upper level being accessed?
3 feet
Where are the sites muster points
Entrance on Beasly, Entrance to Southside, trailers on Northside
What does 100% tie off mean
Always connected to an anchor point.
This device protects workers from electric shock. Its required at all temporary power locations.
What is a GFCI --- Ground Fault Circuit Interrupter?
What is standard used for safety glasses (eye protection)?
ANSI Z87.1 (Z87+).
This type of soil requires the slope to be at least 3/4 to 1.
What is Type A soil?
What is the angle that an extension ladder should be placed at?
A ratio of 4:1 (Vertical-Horizontal)
What does the Fort Bend site logo depict
A Wild Board
The weight/force needed to be withstood for an anchor point for a personal fall arrest system.
What is 5,000 pounds per person?
According to Wanzek Policy how many days is a Permit to Work good to complete work in LOTO
That day
How often must you replace the suspension straps of your hardhat?
Every 12 months
Shoring, Sloping / Benching, Shielding.
What are the three main methods (ways) of providing cave-in protection for excavations?
What is the maximum weight limit for a type I ladder.
250lbs
What is the four R's in R4 program