Field Leadership
Underground
Confined Space
Excavation
General
100

There are four components to our field leadership program to help interact with the work force these four tools are "Layered Audits and ?

What is "Safety Chats, JTOs, and RCOs"

100

________ has the right of way underground.

What is "Mobile Equipment"

100

Name the two types of confined spaces on site.

What is "hazardous and non-hazardous"

100

Ground disturbance permit is required for any piercing or manually digging of the ground/soil that involves penetrating to a depth of greater than ____.

What is "6 inches"

100

ALARA stands for __________.

What is " As Low As Reasonably Achievable"

200

Worker must have a minimum of "___" available hours to rest between shifts.

What is "8"

200

The number of visitors a competent person can take underground.

What is "6"

200

The person responsible for ensuring that all conditions noted on the permit, confined space hazard identification document and JHA have been met prior to entering a confined space.

Who is "The Supervisor"

200

Where a worker is in a trench that is more than 1.2 metres deep, an employer or contractor shall ensure that __________is stationed on the surface

What is a "competent worker"

 to alert the worker in the trench about the development of any potentially unsafe conditions and to provide assistance in an emergency.

200

When working from a straight ladder, stand no higher than the _____ rung from the top.

What is "4th"

300

Day to day bandaids will be stocked for usage in the workplace, the worker cn use the supplied bandaids at any time but must...

What is "Report all injuries to the supervisor"


300

The number of pedestrians in any one group that can use the 500 ramp without utilizing the ramp light system.

What is "less than six (6)"

300

This gas is known as the silent killer and is found in poorly ventilated confined spaces.

What is "Carbon Monoxide"

300

Where a worker is required to enter a trench, an employer or contractor shall ensure that a ladder, stairway or ramp is located not more than _____from a worker working in the trench.

What is "8 Metres" (26 feet)

300

To allow a safe transition, all extension ladders must extend up an additional ____ rungs above any platform, roof or other landing to which the ladder is a means of access

What is " 3 (one metre) "

400

For heavy duty scaffolds or scaffolds built over a certain height they must be ________ and ________by a professional engineer.

What is "approved and designed" 

400

If there is a power outage underground, individuals in the area will ____________then report to the refuge station if power is not restored.

What is "Wait 15 minutes"

400

To ensure hazardous substances don't enter an occupied confined space through attached piping this isolation method is required.

What is a "Double block and bleed"

(Confined space attendant)

400

in the case of type 3 soil, the walls are sloped from the bottom of the excavation or trench, with a slope at an angle not steeper than ____ horizontal to ____ vertical.

What is "one horizontal to one vertical"

400

When ARC rated clothing becomes contaminated with oil or grease, or other conductive material the only options are to?

What is "clean or dispose of the garment" contaminated clothing will not be used.

500

In what scenario can a worker be allowed to exceed the daily Cameco 50Msv of exposure and continue to work in the field? 

What is " The worker's Supervisor must contact Radiation and develop a work plan to not allow worker to exceed the 400Msv for a 7 day weekly total"

500

If there is equipment going up the 500 ramp in front of you,  pedestrians must stay far enough back so that the equipment is __________________.

What is "not within their line of sight"

500

This gas is colorless but identifiable by its rotten egg smell. Often the result of decaying organic matter in a confined space.

What is "Hydrogen Sulfide"

500

Mechanical excavation is not permitted when excavating within __________ in any direction of below ground hazards and/or buildings.

What is "600 mm" (24 inches)

500

If work must extend past the 14 hour maximum what must the worker avoid. 

What is "work shall not include high hazard work as defined in the "Fatigue Management Standard"