There are four components to our field leadership program to help interact with the work force these four tools are "Layered Audits and ?
What is "Safety Chats, JTOs, and RCOs"
________ has the right of way underground.
What is "Mobile Equipment"
Name the two types of confined spaces on site.
What is "hazardous and non-hazardous"
Ground disturbance permit is required for any piercing or manually digging of the ground/soil that involves penetrating to a depth of greater than ____.
What is "6 inches"
ALARA stands for __________.
What is " As Low As Reasonably Achievable"
Worker must have a minimum of "___" available hours to rest between shifts.
What is "8"
The number of visitors a competent person can take underground.
What is "6"
The person responsible for ensuring that all conditions noted on the permit, confined space hazard identification document and JHA have been met prior to entering a confined space.
Who is "The Supervisor"
Where a worker is in a trench that is more than 1.2 metres deep, an employer or contractor shall ensure that __________is stationed on the surface
What is a "competent worker"
to alert the worker in the trench about the development of any potentially unsafe conditions and to provide assistance in an emergency.
When working from a straight ladder, stand no higher than the _____ rung from the top.
What is "4th"
Day to day bandaids will be stocked for usage in the workplace, the worker cn use the supplied bandaids at any time but must...
What is "Report all injuries to the supervisor"
The number of pedestrians in any one group that can use the 500 ramp without utilizing the ramp light system.
What is "less than six (6)"
This gas is known as the silent killer and is found in poorly ventilated confined spaces.
What is "Carbon Monoxide"
Where a worker is required to enter a trench, an employer or contractor shall ensure that a ladder, stairway or ramp is located not more than _____from a worker working in the trench.
What is "8 Metres" (26 feet)
To allow a safe transition, all extension ladders must extend up an additional ____ rungs above any platform, roof or other landing to which the ladder is a means of access
What is " 3 (one metre) "
For heavy duty scaffolds or scaffolds built over a certain height they must be ________ and ________by a professional engineer.
What is "approved and designed"
If there is a power outage underground, individuals in the area will ____________then report to the refuge station if power is not restored.
What is "Wait 15 minutes"
To ensure hazardous substances don't enter an occupied confined space through attached piping this isolation method is required.
What is a "Double block and bleed"
(Confined space attendant)
in the case of type 3 soil, the walls are sloped from the bottom of the excavation or trench, with a slope at an angle not steeper than ____ horizontal to ____ vertical.
What is "one horizontal to one vertical"
When ARC rated clothing becomes contaminated with oil or grease, or other conductive material the only options are to?
What is "clean or dispose of the garment" contaminated clothing will not be used.
In what scenario can a worker be allowed to exceed the daily Cameco 50Msv of exposure and continue to work in the field?
What is " The worker's Supervisor must contact Radiation and develop a work plan to not allow worker to exceed the 400Msv for a 7 day weekly total"
If there is equipment going up the 500 ramp in front of you, pedestrians must stay far enough back so that the equipment is __________________.
What is "not within their line of sight"
This gas is colorless but identifiable by its rotten egg smell. Often the result of decaying organic matter in a confined space.
What is "Hydrogen Sulfide"
Mechanical excavation is not permitted when excavating within __________ in any direction of below ground hazards and/or buildings.
What is "600 mm" (24 inches)
If work must extend past the 14 hour maximum what must the worker avoid.
What is "work shall not include high hazard work as defined in the "Fatigue Management Standard"