This project delivery method combines design and construction services into a single contract. The firm is also solely responsible for solving any challenges that arise, such as issues with the design, budget, or construction
What is Design Build?
This project features massive slabs of concrete that are hoisted by pulleys & cranes to create a large box shape building.
What is Tilt Wall
This certification is often considered the most important thing in the world to Project Managers, often held to the level of a first born child. Recruiters often find it useless and ignore it when candidates talk about it.
What is the PMP Certification
The final list of construction items performed before the general contractor begins the official hand off of a building to the owner
What is the punch list?
This person is responsible for creating virtual renderings of a building using different programs such as Autodesk, Revit and Autocad 3d
What is a virtual design coordinator?
This construction process where the owner hires an architect or designer to create project plans, then bids out the work to general contractors
What is hard bid or Design Bid Build?
This type of project is often categorized as a multiple use building often combined with retail and commercial/residential apartments.
What is mixed use?
This certification is an essential for any construction worker and is given in trainings of 10 and 30 hours
What is OSHA
This typically happens after the job walk and after the bidder has reviewed the bid documents. The GC or owners sets a date and time when the bidders can submit any questions they have regarding the project, and the GC, owner, or architect then sends a message out with all the answers.
What is an RFI?
This person is often the leader of the finance division and responsible for approving bills/paying subscriptions
What is the Controller/CFO?
A construction method where a project owner negotiates a contract with a single general contractor (GC) to perform the work
What is negotiated bid?
This type of construction is a divided project where heavy steel or concrete are divided by levels to form a sturdy foundation for a more economically used "topper"
What is podium construction?
This building certification offers the framework for healthy, highly efficient, and cost-saving green buildings, which offer environmental, social and governance
What is the LEED Certification program?
a formal request to modify the original contract or agreement for a construction project. It documents an agreement to change the project in some way, such as by adding or removing work, altering the design, or revising the schedule
What is a change order?
This unsung hero is often the person who keeps a project organized and rolling while getting paid an average salary under 65k.
What is the Project Coordinator/Project Admin?
The systematic, organized approach to providing necessary functions in a project at the lowest cost. This process promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality.
What is value engineering
a construction process that allows owners to complete multiple projects using a single contract, instead of preparing separate bids for each project. They can be used for maintenance, repair, and minor construction projects.
What is a JOC Contract
These two certification requires at least 5 years of training and grants the ability complete construction documents for design and feasibility.
What are the AIA (American Institute of Architects) and PE (Professional Engineer) Certifications.
the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project
What is a submittal?
This person is often a member of the subcontractor teams who are responsible for starting different types of machinery in electrical and mechanical systems
What is a commissioning agent/manager?
This act of estimating provides an approximate need of materials for a project. No pricing is provided
What is a take off
This type of construction has been introduced in the past 15 years and features reinforced wood materials to create a durable product that is as a strong as steel and concrete
What is mass timber?
These certs are awarded to journeyman subcontractors specialists after years of experience and tests. Most commonly are in the plumbing and electric field. They are often needed in order to start your own business or to finalize subcontractor activities.
What is the Master certification.
This meeting is a weekly stand up meeting of all the parties involved such as the owner, architect, engineer and general contractor.
What is the OAC Meeting?
A pure overhead position, these professionals claim to win work while mostly playing golf and attending useless aware ceremonies.
What is a business development associate