Bid It to Win It
Virtual Visionaries
Timing is Everything
From Dirt to Done
Hard Hat Hodgepodge
100

VE stands for these options estimators give to clients to reduce costs or improve efficiency?

What is Value Engineering?

100

This is what VDC stands for

What is Virtual Design & Construction?

100

This is the longest sequence of tasks that must be completed on time for the entire project to be completed by its deadline

What is the Critical Path?

100

RFI stands for this

What is a Request for Information?

100

PPE stands for this - don't forget it before going to a job site

What is Personal Protective Equipment?

200

In the five stages of the Preconstruction Process, the acronym GMP stands for this type of cost-capped contract

What is Guaranteed Maximum Price

200

In this program, you can view a 3D model without needing specific modeling software?

What is Procore or Assemble?

200

This is a key event or specific point within a project timeline that marks significant stages of progress or completion

What is a milestone?

200

This documentation must be completed every day, even if no work occured

What is a Daily Log?

200

This tool is used to document exterior building and site progress

What is a Drone?

300

In the five stages of the Preconstruction process, CD stands for this

What are Construction Documents?

300

This tool is used to document interior building progress

What is a 360 camera?

300

These are the individual pieces/steps of work in a schedule that need to be completed to build a project

What are activities/tasks/scope?

300

This should be created as soon as a potential cost or schedule impact is identified

What is a Change Event?

300

To IMC Construction, SPD stands for this

What is Special Projects Division?

400

Estimating uses OST to do takeoffs, what does OST stand for?

What is On-Screen Takeoff?

400

This tool is used to document existing building conditions

What is a Laser Scanner?

400

This is the short-term schedule tool typically used to plan work over the next few weeks in construction

What is a look-ahead schedule?

400

These must be approved before materials are fabricated and installed

What are Submittals?

400

These are short pre-written safety meetings designed to heighten employee awareness of workplace hazards and OSHA regulations

What are Toolbox Talks?

500

PLAM stands for this in relation to millwork

What is Plastic Laminate?

500

This software is most commonly used for clash detection and model coordination

What is Navisworks?

500

This is a project management technique used to identify the sequence of essential tasks or activities that directly impact the project's overall timeline

What is Critical Path Method (CPM)?

500

This is the final checklist of minor items, repairs, and missing details that must be completed before a project is officially finished

What is a Punch List?

500

Also known as an SOV, this itemized list breaks down the total project contract price into individual tasks or phases

What is Schedule of Values?