Forms
Federal Acquisition Regulation
Procedures
OPE
GFMS
100

This form is used to make solicitation and contract changes

Standard Form 30

100

This part of the Federal Acquisition Regulations covers Construction and Architect and Engineering Services

FAR Part 36

100

Negotiation Memorandum over the SAT up to $5 million require final approval at what level?

Branch Chief

100

The Facilities Design, Construction Division falls under the OPE umbrella. How many divisions does OPE have total?

seven

100

What document type is used for a task order delivery order?

AQO

200

This form is used to solicit offer and award contracts

Sf 1449

200

This part of the Federal Acquisition Regulation covers Contractor Qualifications

FAR Part 9

200

After contract award and receipt of payment and performance bonds, the contracting officer issues this document

Limited Notice to Proceed 1 for design

200

Navigate through the OPE sharepoint site and you can locate information on this must needed authority.

Warrant appliction

200

how is a $0 requisition added to a modification to ensure it's closed

loaded to the header accounting line

300

This form is a resource for providing security requirements and classification guidance to a contractor

DD 254

300

Tennessee is the 16th state in the Union, FAR Part 16 covers what in Federal Government Contracts?

Contract Types

300

This meeting takes place after the solicitation is issued to interested bidders

PreBid site visit meeting

300

Browse the OPE sharepoint site and you will find a solicitation roadmap under this program

Path Finder

300

If a document isn't printing the way you believe it should print, what action did you not do?

Retrieve Segments

400

This form is prescribed for use in soliciting bids for supplies or services and for awarding the contracts that result from the bids, as specified in 14.201-2(a)

Standard Form 33

400

Six time NBA Champion Michael Jordan wore #23, in FAR Part 23 you can find information on what topic?

Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-Free Workplace

400

These unique indentifiers are given to contractors in order to access the solicitation files

What are the key codes
400

J&A up to $250K require approval at what level

Contracting Officer

400

When an IPP code is used, where are the two other sections that IPP needs to be referenced?

Office Address and Terms and conditions

500

This form is prescribed for use in awarding fixed-price contracts for architect-engineer services, as specified in 36.702(a)

Standard Form 252

500

When you lease an apt, you have the option to renew or extend your lease on a month to basis. This FAR Clause gives COs the option to extend services up to 6 months only.

FAR 52.217-8

500

It is the responsibility of the traveler or travel arranger/coordinator to enter their travel itinerary- via this State Department's system before traveling to an overseas Post

Electronic Country Clearance (ECC)

500

Solicitation Reviews over $100M up to $250M require approval at what level?

Head of the Contracting Activity

500

When performing a de-ob modification, what is the first step

Generate obligation status report