Responsibilities
cranes
side load/wind
shock loading/submerged lifts
Jibs/multi crane
100

informs operator weight movement and placement only one who can start a lift after it has been stopped

Lift Director


100

crane must be level within

1 percenr

100

this is the only allowable side loading

freely suspended loads

100

another name for loading

Dynamic Loading

100

definition of jib

Extension of the boom

200

uses verbal and non verbal communication to direct crane operator

Signal person

200

acurate measure of level place a level 90degrees apart on the 

upper works

200

side loading can do this to a boom

break or severely damage

200

when lifting in water as the load comes out of the water loading on the crane will do this

increase

200

as jib angle offset increases the capacity of the jib?

decreases

300

Barricades keep nearby workers out of this on a crane

Tne operation radius of the outermost body of the crane

300

a level site and condition of soil must be good in order for this to apply

Load chart ratings

300

lifting out of level, rapid swing ,improper tip up actions, and high winds all can cause this

side loading

300

Lifting to fast will _____ effective load of weight

increease

300

This keeps a manual extension from retracting

Locking pin

400

operators shall have academic and performance guidelines in these 2

AMSE standard B30.5 and 29CFR 1926.1400

400

when a upper structure is rotated over the side the capacity will be _______ because the distance from the cranes center of gravity to the tipping axis is shortened

lower

400

this is one of the most overlooked stability factors and will increase load radius , decrease capacity, and make the crane hard to operate

wind

400

when pick and carry operations it is important to do these 3 things

use the shortest boom possible, keep load close to ground, load should be carried in line with direction of travel

400

True or False It takes 2 signal operators when making a multi crane lift

False only 1

500

written assesment and practical exam must be taken every____ years to obtain a crane cert

5 years

500

Hydralic boom sections should be extended

by manufactures specs

500

at most cases winds at ____ will stop crane operations per manufactures spec

30 mph

500

a sudden snatching of a load ,a frozen load, or rapid hoisting of the cable all can cause this

Shock loading

500

multi lifting requires each crane to be reduced______ of its net capacity

75%