100

Cranes must be level within ______ to operate

What is 1%

100

Swinging an out of level crane to the low side has this effect on the radius

What is increase

100

If an operator makes contact with a powerline, and cannot move away, they should

What is remain in the cab 

100

The effective weight of the ______ could be higher or lower than the actual weight

What is the jib

100

Boom angle indicator is this category

What is category II

200

This will transfer power to a hydraulic system on a crane

What is a clutch or a PTO

200

A Cherry picker on tires swings over the side at a minimum radius can cause this

What is loss of backward stability

200

When cranes are working near powerlines and encroachment is possible they should have a

What is a dedicated spotter

200

Load weights and load _______ are important to consider before making a lift

What are size or dimensions

200

A horn and boom stops are considered

What are safety devices

300

Crane capacity on outriggers is based on this percent of stabilty

What is 85%

300

A vertical angle on a load line seen from the cab indicates 

What is sideloading

300

Assembly/Disassembly under live powerlines is

What is prohibited

300

A lattice boom section suspended out past the pendant lines.  

What is cantilever 

300
A telescopic crane has to have a functional two block prevention system when lifting ________.

What is personnel

400

When setting up next to a building you might have to use this section of the load chart

What is the range diagram

400

Deflection of the boom or pendant line stretch will cause the radius to

What is increase

400

A crane operator must stay ____ feet away when working near a powerline of unknown voltage up to 350kV 

What is 20

400

When assembling a lattice boom crane these pins should be installed first

What are the top pins

400

An operator can run a crane this many days before an anti two block must be repaired(if it is not working)

What is 7 days

500

A crane sitting 3 degrees out of level will increase boom stress this much 

What is 50%

500

The lift radius is 56'. The chart list values in increments of 5'.  This is the radius chart value that shall be used.


What is 60'

500

When working near powerline that is 572kV the operator must stay this far away.

What is 35 feet

500

When installing boom pins that have a head on one side and taper on the other side the keeper should always be on THIS side of the boom.

What is the outside

500

Using the LMI to figure the weight of the load is permitted up to this % of capacity.

What is 75%