CRITICAL LIFTS
RAM LIFITS
CRANE LIMITS
CRANE INFO
CRANE CREW
100
WIND SPEED THAT CAUSES LIFTS TO BE CONSIDERED CRITICAL
What is 30 KNOTS SUSTAINED
100
RAM STANDS FOR
What is RADIOACTIVE MATERIAL
100
WHERE ARE THE CRANE LIMITS LOCATED
What is GENTRY LEGS
100
NSTM 589
What is NAVY CRANE INSTRUCTION
100
YELLOW HELMENT WITH BLACK STRIPE
What is SINGALMAN UI
200
% OF CRANE CAPCITY THAT CASUES A LIFT TO BE CONSIDERED CRITICAL
What is 85%
200
Qualified under NSTM 589 and have an occupational radiological worker certification as per ARCOISNT 9900.4 and is used for rigging
What is Radiological Control (RADCON) crane rigger
200
MAX BOOM ANGLE
What is 69 DEGREES
200
WHAT KIND OF BRIEF NEEDS TO BE HEALD BEFORE AND AFTER LIFTS
What is SAFETY
200
KEEPS TRACK CLEAR AND DETERS PERSONNAL FROM WALKING UNDER THE LOAD
What is TRACKWALKER
300
USING BOTH CRANES AT THE SAME TIME
What is TANDEM LIFTS
300
RADCON RIGGER TAKES INSTRUCTION FROM
What is CRANE CREW SIGNALMAN
300
MIN BOOM ANGLE
What is 25 DEGREES
300
DO WE LIFT NEAR SUB'S PROPELLER
What is YES
300
WHO IS REQUIRED FOR CRITICAL LIFT
What is SAFETY OBSERVER, OPERATOR, SIGNALMAN, TRACKWALKER, RIGGER, 2 OR MORE TAGLING, CRANE TECH
400
CAN WE USE THE CRANE FOR PARTICALLY SUBMERGED OBEJETS
What is YES
400
RADCON have to provide their own rigging gear, BUT ALSO MUST
What is meet the weight test and handling requirements
400
MAX HOIST LIMITS
What is 4-6 FEET
400
COMMAND DUTY OFFICER AND COMMANDING OFFICER NEED TO APPROVE WHAT KINDS OF LIFTS
What is CRITICAL
400
JOB CONSISTS OF STEADING THE LOAD
What is TAGLINE
500
FINISH THE REST OF THIS CRITICAL LIFT REQUIREMENT:Lifts removing equipment from the sail of a unit in dock or lifts conducted within 6 feet around the sail
What is NO LOAD WILL BE LIFTED OVER THE SAIL
500
WHO IS AUTHORIZED TO PROVIDE CRANE CREW PERSONAL FOR RAM LIFTS
What is ARCO ARE NOT AUTHORIZED TO HANDLE RAM DIRECTLY, RADCON MUST HANDLE
500
MIN HOIST LIMIT
What is 6 FEET
500
ARCO 9000
What is ARCO CRANE INSTRUCTION
500
CRANE OPERATOR HARD HAT COLOR
What is BROWN HARD HAT WHEN CAB IS OPEN, NO HARDHAT WHEN CRANE CAB CLOSED
M
e
n
u