Renewable Energy
Green Materials
Waste Management
Interior Enviro. Quality
Integrative Process/ Best Practices
100

These are 3 types of renewable energy

Solar, wind, geothermal, etc

Daily Double

100

These are the 3Rs

Reduce, reuse, recycle


Double Jeopardy

100

This is the process of slowly taking apart a building

Deconstruction

100

This is the amount of credits a project can earn in IEQ

16

100

Is one impact of construction that must be mitigated

Air Pollution, Water Runoff, etc

200

This is the type of energy OSU signed a deal to begin purchasing last year

Wind

200

This is the number of credits a project can gain for Materials and Resources

13

200

This is the most common method used to clear a building

Selective Salvage or Selective Deconstruction

200

This is the name of a sickness caused by spending time in a building with poor IEQ

Sick Building Syndrome, Building Related Illnesses

200

Is the name of the process of evaluating a product by reviewing its ecological impact

Life Cycle Assessment

300

This is the type of energy generated on the South Oval

Geothermal

300

Denim insulation is an example of _____ recycling

Post-consumer

300

This is the material salvaged in the Grey to Green documentary

Concrete Slabs, Steel Beams

300

This is the term used to describe airing out a building before occupancy

Flush Out

300

This is the software utilized for a LCA

BEES, ATHENA

400

These are the two primary types of wind turbines

Horizontal-Axis and Vertical Axis

400

This is the maximum amount of years a product has to renew to be classed as Rapidly Renewable Material

10 years

400

This is the name of the method of reutilizing recycled building material

Adaptive Reuse

400

This is one place Lead is found in besides paint

Plumbing

400

Is one example of a method to prevent dust/air pollution on a construction site

Double Jeopardy 

Site washing, wet saws, dust vacuums

500
This is the amount of credits a project can earn for producing renewable energy

5

500

These are the 3 parts of a Building product Disclosure

Environmental Product Declaration, Sourcing of Raw Materials, Material Ingredients

500

These are the five types of recycling all LEED buildings must offer

paper, cardboard, glass, plastic, and metal

500

This is the name of the illness caused by buildings with poor IEQ that have clear identifiable causes

Building Related Illnesses

Daily Double

500

These are the four steps/processes involved in a LCA

Scoping, Inventory, Impact, Improvement

M
e
n
u