Eco DD
Wet Wet
GT-PO-1
Permitting
Tree Huggers
100

This is who you can go to to get your reports, emails, etc. reviewed. 

Who is EVERYONE ON YOUR TEAM?

100

This trio of indicators is evaluated when determining whether an area qualifies as a wetland in Florida.

What are hydric soils, hydrophytic vegetation, and wetland hydrology?

100

This is the regulatory consequence of impacting or misclassifying an occupied burrow within a project area.

What is unauthorized/incidental take of a protected species?

100

This federal permit program regulates the discharge of dredged or fill material into waters of the United States.

What is the Section 404 Permit? 

100

DBH means

What is Diameter Breast Height?

200

This Eco DD section identifies possible impacts and mitigation, without prescribing project design changes.

What is the ecological constraints section?

200

This term describes wetlands that fall under regulatory authority as opposed to those without enforceable oversight.

What are jurisdictional wetlands?

200

This action is prohibited once a burrow is identified within a project footprint without authorization.

What is clearing or construction within the burrow buffer?

200

This agency regulates the Coastal Construction Control Line (CCCL).

What is the Florida department of environmental protection?

200

This condition frequently results in trees being exempt from preservation requirements.

What is a dead or hazardous tree?

300

To identify potential wetland mitigation options for a project, this geographic/basin designation area must first be determined.

What is the mitigation bank service area?

300

This federal document establishes the technical basis for identifying wetlands nationwide.

What is the 1987 Corps of Engineers Wetlands Delineation Manual?

300

This buffer applies around gopher tortoise burrows during construction activities.

What is a 25-foot burrow buffer?

300

Discovering fill material placed in wetlands without authorization most often leads to this permitting pathway.

What is an after-the-fact permit?

300

Conks, fungal fruiting bodies, or soft, decayed wood along the trunk are field indicators of this condition.

What is bole rot?

400

This source combination (4) is used in Eco DDs to identify potential listed species without making regulatory determinations. 

What are site observations, iPAC, consultation areas, and the biodiversity matrix? 

400

This regional supplement applies specifically to wetland delineations in Florida.

What is the Atlantic and Gulf Coastal Plain Regional Supplement?

400

Relocated juvenile gopher tortoises are identified using this approved marking method rather than drilling or tagging.

What is marginal scute notching?

400

This permit type is typically required when impacts cannot be avoided and exceed standard thresholds.

What is an Individual Permit?

400

This term is commonly used to describe a tree that exceeds standard protection thresholds due to size, age, or species.

What is a specimen tree?

500

This is something every consultant needs at the end of the day.

What is an alcoholic beverage?

500

This soil condition is defined by a matrix chroma of 2 or less with redoximorphic features.

What is hydric soil?

500

Female gopher tortoises are typically identified by this plastron characteristic.

Answer: What is a flat plastron?

500

This permit coordination is required when federal authorization is issued but state water quality must still be addressed.

What is Section 401 Water Quality Certification?

500

This structural defect occurs when bark becomes trapped between two stems or a branch union, preventing proper wood-to-wood attachment.

What is included bark?