These are created by forming and shaping metals by hammering, pressing, or rolling.

What are Forgings?

100

What was the first (DA) Ice-breaking question

What is 

What is your theme song?

100

This is the operation with the lowest output that is pacing the production.

What is a bottleneck?

100

The Pick List can be found here

What is SNC?

100

How often is the time fence cleaned out?

What s once a month?

200

This is used for cutting material, drilling holes or welding

What is Lasering?

200

What Letter represents High Value Material in MRP Planning

What is A?

200

The amount of time a part spends before value added work is performed on it.

What is queue time?

200

What the supplier pulls in order to ship parts

What is a label?

200

The parts at the supplier that are being manufactured but are not finished goods yet.

What is WIP?

Work In Process

300

This is the joining of material together using a filler material which is melted between the layers of material

What is Brazing?

300

Who performs the eFPR?

Who it Engineering?

Engineering First Piece Review 

300

This is when suppliers run batches of parts to gain efficiencies for machine setup and for outside processing.

What is lot sizing?

300

The amount of days before the requirement date that the supplier can ship

What is the shipping horizon?

300

The person that should be providing you with a Leading Indicator Report

Who is a DAFR?

Delivery Assurance Field Representative

400

This process inspects for cracks and other surface imperfections

What is Magnetic Particle Inspection?

400

Where does the supplier put First Article Inspection data

What is NetInspect?

400

This is the time needed to get a machine ready for production.

What is set up time?

400

If this appears in the plant column, the line item will be blocked.

What is a TBD?

400

The combination of Manufacturing Lead Time and Input or Raw Material Lead Time.

What is Full Lead Time?

500

This process involves the use of high heat in a furnace to alter the physical properties of a part.

What is Heat Treat?

500

We need two Widgets per engine to build. What is the UPE?

What is 2?

Units per engine

(Ex. you need two wheels per bicycle, so 1 tire does allow them to complete a build)

500

This is a form of expediting international shipments by getting priority through customs and a special truck from the airport

What is a Hotshot?

500

If I have a "Y" in my column, I should have a value greater than zero.

What is IR Qty?

IR = Inspection Record (Inspection data that supplier needed to upload)

500

How many ways do suppliers have to upload their commit date

What is 3?

1. Via the Maintain Confirmations screen in SNC, 

2. Via the old Commit download/upload method

3. Via the new Commit download/upload method.