These are created by forming and shaping metals by hammering, pressing, or rolling.
What are Forgings?
What was the first (DA) Ice-breaking question
What is
What is your theme song?
This is the operation with the lowest output that is pacing the production.
What is a bottleneck?
The Pick List can be found here
What is SNC?
How often is the time fence cleaned out?
What s once a month?
This is used for cutting material, drilling holes or welding
What is Lasering?
What Letter represents High Value Material in MRP Planning
What is A?
The amount of time a part spends before value added work is performed on it.
What is queue time?
What the supplier pulls in order to ship parts
What is a label?
The parts at the supplier that are being manufactured but are not finished goods yet.
What is WIP?
Work In Process
This is the joining of material together using a filler material which is melted between the layers of material
What is Brazing?
Who performs the eFPR?
Who it Engineering?
Engineering First Piece Review
This is when suppliers run batches of parts to gain efficiencies for machine setup and for outside processing.
What is lot sizing?
The amount of days before the requirement date that the supplier can ship
What is the shipping horizon?
The person that should be providing you with a Leading Indicator Report
Who is a DAFR?
Delivery Assurance Field Representative
This process inspects for cracks and other surface imperfections
What is Magnetic Particle Inspection?
Where does the supplier put First Article Inspection data
What is NetInspect?
This is the time needed to get a machine ready for production.
What is set up time?
If this appears in the plant column, the line item will be blocked.
What is a TBD?
The combination of Manufacturing Lead Time and Input or Raw Material Lead Time.
What is Full Lead Time?
This process involves the use of high heat in a furnace to alter the physical properties of a part.
What is Heat Treat?
We need two Widgets per engine to build. What is the UPE?
What is 2?
Units per engine
(Ex. you need two wheels per bicycle, so 1 tire does allow them to complete a build)
This is a form of expediting international shipments by getting priority through customs and a special truck from the airport
What is a Hotshot?
If I have a "Y" in my column, I should have a value greater than zero.
What is IR Qty?
IR = Inspection Record (Inspection data that supplier needed to upload)
How many ways do suppliers have to upload their commit date
What is 3?
1. Via the Maintain Confirmations screen in SNC,
2. Via the old Commit download/upload method
3. Via the new Commit download/upload method.