What are three essential items of Personal Protective Equipment (PPE) required on a demobilization site?
Hard hat, safety glasses, gloves
What are two key tasks involved in site restoration?
Regrading and replanting vegetation
What is the purpose of securing equipment during transport?
To prevent shifting, tipping, or falling during transit
Who is responsible for overseeing all demobilization activities?
The Project Lead
What animal can hold its breath the longest underwater?
The sperm whale (up to 90 minutes!)
What is the purpose of a 360 walk-around before moving equipment?
To identify obstacles, leaks, or damage that could pose a hazard
Why is it important to properly dispose of construction waste?
To minimize environmental impact and comply with regulations
What federal agency provides guidelines for transporting equipment?
Department of Transportation (DOT)
What is the role of the Environmental Specialist?
Monitor environmental impact and ensure compliance with regulations
What’s the only food that never spoils?
Honey
Why is it important to use a spotter when moving large equipment?
Spotters help guide operators and prevent collisions in tight or congested areas
What is one risk of not cleaning equipment before it leaves the site?
Spreading contaminants or invasive species
What is the purpose of an After-Action Report (AAR)?
To review what went well and what could be improved after demobilization
What is “Stop Work Authority”?
The right and responsibility to stop work if unsafe conditions are observed
Which planet has the most moons?
Saturn
What is the purpose of high-visibility clothing on a job site?
To ensure workers are easily seen, especially in low-light or high-traffic areas.
What environmental risks can arise from improper disposal of hazardous materials?
They can contaminate soil and water, harm wildlife, and pose health risks to humans.
Why is documentation important during demobilization?
To maintain accurate records and streamline future processes
What is the responsibility of crew members during demobilization?
Follow instructions, use PPE, and adhere to safety protocols.
What’s the national animal of Scotland?
The unicorn 🦄
What should you do if you see an unsafe condition on-site?
Use Stop Work Authority to halt operations until the issue is resolved.
How can weather conditions impact demobilization efforts?
Rain, wind, or extreme temperatures can delay work, damage restored areas and increase safety risks.
What should be done before transporting equipment to ensure safety and compliance?
Conduct a pre-transport inspection, secure the load, and verify DOT compliance.
Why is it important for all team members to understand their roles?
It ensures coordination, accountability, and safe, efficient project execution.
DOUBLE POINTS
If you could have any superpower during demobilization, what would it be and why?
(Open-ended)