How many strikes need to be found in a test square.
10
A Claim will not count towards your number with a...
Claim Number
What time should you arrive for your A/M?
30mins prior
What's the first thing you do when you receive an estimate?
Upload to Acculyx
How many bundles equals a Square.
3
What time do you arrive at install?
6:30AM
First photo taken on inspection?
What does DOL stand for?
Date of Loss.
When is it okay to use an adjusters ladder?
Never.
How do you request an estimate breakdown?
Task a leader in Acculynx
2/12 and Below
What is the first step when materials arrive?
Confirm material with Job Order form?
What are the 2 most common categories of shingles;
& Do you tell them apart?
3Tab & Laminate;
3 Tab is flat and sections, while laminate is a 3D architectural shingle.
Whats the password to HailRecon?
Designmy2021
What form is needed to give to the adjuster at the meeting?
SOR (Scope of Repairs)
What does RCV and ACV Stand for?
Replacement Cost Value
Actual Cash value
What are the 3 main types of decking?
OSB, Radiant Barrier & Plank
200 Bonus Points:
Whats the min width of decking needed.
What all goes in a project overview?
Total Trades and dates of repairs.
Weather of roofing install.
Crew Chief Name(s).
Check amounts.
How can you get ALL the drip edge paid for replacement?
Photograph felt under drip edge.
What are the 5 steps to a roofing sale?
1. Inspection
2. Claim
3. Adjuster Meeting
4. Signing
5. Install
What's the best questions to ask an adjuster to break the ice?
"How many more do you have today?"
For a job to be moved to Approved: You need both a signed contract and a completed_____________?
Contract Worksheet
What all needs to be done on your post install checklist? PHOTOS NEEDED TO BE UPLOADED AFTER JOB.
Caulking on exposed nails
Painted Pipe Jacks
Attic Inspection for punctures
Field Shingle Cuts with Chalk line
What does PWI stand for?
Paid When Incurred
200 Bonus Points:
What are the 3 most common PWI items to look for?
What are the 3 types of photos needed on an inspection?
1. For Homeowner (Urgency)
2. For Insurance (Test Squares)
3. For Company (Vent Count)
What 3 things are needed for a reinspection?
1. Detailed SOR
2. Inspection File
3. Completed Estimate
What are the 4 Types of Adjusters?
1. Staff Adjuster
2. Independent Adjuster
3. CAT Adjuster
4. Virtual Adjuster
Percentage per Age of roof & No.
200 Bonus Points: What 2 main reasons can make the depreciation non recoverable?
If a chimney is 30 inches in width, there must be a _____________?
Chimney Cricket:
200 Bonus Points:
What does a cricket do?
What all is needed on a job closeout, to get paid?
Cover Page, with address and job number.
Trades completed and dates.
Total Money collected and dates.
Individual Checks and Deposit Slips (PicStich)
Customer Satisfaction Survey.
Project Checklist.