This is a nefarious practice of sending emails to individuals, pretending to be a reputable source, enticing victims to divulge information.
What is "Phishing"?
This project, located in Union City along Union City Boulevard, is Construction Inspector Aaron Terrell's all-time favorite project.
What is "The Sugarmill"?
This is the leading cause of fatalities in construction.
What are "Falls"?
This is the color of bananas.
What is "Yellow", or "Brown (old)"?
When would you like the requested work to be completed?
What is "ASAP"?
This is the most vulnerable aspect of any organization.
What is "You"?
What is "Me"?
What is the "End-User"?
These two things impact the calculation of the initial PWSE estimate amount.
(The fee used to pay for engineering plan review and construction inspection time)
What are "Length of Proposed Public Water System Extension" and "Number of Residential Units".
This PPE helps you stand out at a construction site.
What is "Hi-Vis apparel"?
This is the nutrient most commonly affiliated with bananas.
What is "Potassium"?
Development Services Division's new digital platform for processing Customer Work Requests and Customer Jobs.
What is "Cityworks"?
This "greek-like" program will deceive its victim by looking like a normal application but really is malware.
What is a "Trojan"?
The mechanism to add lands outside the District's boundary into the service area.
What is "Annexation"?
This PPE is required when you visit a construction site.
Hint: 5 items
What are "safety toe boots", "hi-vis vest", "hard hat", "safety glasses", and "gloves"?
This fruit, popular in South America, is similar to a banana but less sweet.
What is a "Plantain"?
This field, located near the end of the Customer Work Request Application, is one of the most important parts of the application.
What is the "Signature"?
This is a method of access control by which users must present multiple, separate pieces of identification, such as a password and keycard, in order to access a system.
What is "Multi-Factor Authentication"?
Construction tasks performed prior to "Conditional Acceptance".
(also known as ACWD Form #57)
What are "Meter Boxes Set", "Subgrade finalized", "Valves Accessible", "Installation Complete", "Pressure Test Pass", "Bac-T Test Pass"
When an excavation reaches this depth, additional shoring and cave-in protection is required by CalOSHA.
What is "5 feet"?
This is the approximate amount of Calories in a standard banana.
What is "100 Calories"?
After a Deposit Letter goes out to a Customer, these are some of the "holds" on the jobs prior to releasing the work for construction.
Hint: Six "holds"
What are "Payment", "Easement Deeds", "Encroachment Permits", "Groundwater Well Checks", "PWSE Conditional Acceptance", and "Inspector Release"?
Criminals access someone's computer and encrypt the user's personal files and data. The user is unable to access this data unless they pay the criminals to decrypt the files.
What is "Ransomware"?
Tasks performed after a project has "Final Acceptance".
(also known as ACWD Form #29)
What are "GIS Updates", "1-Year Construction Inspection", "21A Contract Cost Distribution", "Job Number Closure"
When an excavation reaches this depth, stairs, ramps, or ladders are required by CalOSHA.
What is "4 feet"?
This is the most popular American variety of banana.
What is "Cavandish" or "Yellow Cavandish"?
Once a Job Order is released by Engineering, these specific Divisions perform these specific tasks.
What are 1) "Finance - Confirms Payment", 2) "Distribution Maintenance - Creates Work Orders, Installs Work, As-Builts Drawings, Tests Backflows (as necessary), Sends Accounting Costs to Finance", 3) "Customer Service - Updates Cayenta/Account Information", 4) "Finance - Closes Jobs and Reports Costs", 5) "Development Services - Updates GIS"