I need to be kept closed after stuff gets placed inside
What is the sea-can or Garbage bin
You need me first. prior to being able to work at heights
What is fall protection training?
I must be completed every time before I use rigging
What is a Rigging Inspection?
I happen at noon on Wednesdays
What is the testing of the alarm Systems?
Most people do not use my name
Who is Beaker?
I am to be completed throughout the day and not just once a shift
What is cleaning up my work area?
The small snap-hook gets connect to me on the harness
What is the D-Ring?
I am used unless I cause more of a hazards then not
What is a tagline?
780-713-5210
What is the Emergency Number?
This is process used for controlling hazards that is completed in order
What is the Hierarchy of Controls?
I must be stored 6m (20 feet) from each other
What are oxygen and fuel gas cylinders?
I must be able to support 3600lbs
What is an anchorage point?
I will be set up during a lift to keep unauthorized people out of the area
What is the lift exclusion Zone?
This persons safety is the most important in a rescue situation
What is your own personal Safety?
This is used for planning, Hazard control and is with you throughout the day.
What is your Field Level Hazard Assessment?
You must have me to be able to drive a Worley Vehicle
What is my Green Drivers?
These D-ring's are placed at the hip location
What are positioning D-rings?
I need to be known before you can preform a lift with a crane
What is the weight and center of gravity.
This where you find all the necessary information in an emergency.
What is the ERP?
This provides specific technical health and safety rules for workplaces In Alberta
What is the Alberta OH&S Code?
I am an on the day assessment which compliments the completed site specific HSE assessment register for the scope of work planned. I shall be completed for all job tasks that are non-routine or potentially hazardous activities
What is the JHA?
This is the section of the Alberta OH&S Code that you find Fall Protection
What is Part 9
I am the standard that all rigging hardware shall be manufactured to
What is the ASME B30.26 Rigging Hardware Safety Standards for Cableways, Cranes, Derrick's, Hoist, Hooks, jacks, and Slings?
This must be completed prior to working a heights
What is the Fall Rescue plan?
This must be completed on the Firebag site prior to any work taking place.
What is the permit?