Standards
Pole parts
SAP/Tasks
All in the Name of Labor
Name that BOUD Tool
100

The standard you would use for a 1ph horizontal build.

What is 23-110 Crossarm Tangent or Corner Structure Single-Phase Wye or Delta and Open Wye?

100

This Equipment. 

What is an Insulator?

100

This task covers situations like tree removal. 

What is FORW?

100

The labor adder that needs to be added to every job.

What is the Fixed Time adder?

100

This tool helps places items at the correct distance apart and is very straight. 

What is the Place Line tool?

200

The standard you would use for a three phase tangent structure.

What is 23-140 Crossarm Tangent or Corner Structure—Three-Phase Wye or Delta?

200

This equipment.


What are Crossarms?

200

This task's short text is filled out with the cost estimate for the project.

What is FINC?

200

The labor adder that gets added when we're working with primary.

What is the hotsite adder OH/UG?

200

This tool helps you label your conductors.

What is the Place Text tool or place text along tool?

300

The standard you would use for a multi-phase vertical pull-off down guy. 

What is 22-101-7?

300

This equipment.

What is a Fuse?

300

This task you need to change the start and end dates to make sure it gets finished in a timely manner. 

What is PPRR?

300

The labor adder for when we need to transfer a transformer?

What is Transfer EQUIP? 

300

This tool helps cut off unwanted sections. 

What is the Trim Multiple tool?

400

The standard you would use for a 1ph dead-end transformer installation.  

What is 26-101-1 Detail B? 

400

This Equipment.

What is a transformer?

400

This task you put the design doc number in the short text.

What is REVW?

400

If this item exists on the pole, we need to transfer it in event of a pole replacement. 

What is the CE ID Tag?

400

This tool helps you permanently change elements on the title block, and separates them from their group formatting. 

What is the Drop tool?

500

The standard you would use for a fuse installation for a single phase riser. 

What is 25-301-3?

500

This Equipment.

What is a recloser?

500

This task you use if you created NJUNS tickets associated with the job.

What is FNMO?

500

This item gets treated like a part, although it is a labor adder.

What is conductor jumper (PRIM OR SEC)? 

500

This button you have to press before you can place title blocks.

What is the TB Border level? 

M
e
n
u