100

FSR

First Stage Regulator (Regulation)

100

Runs Parallel with L1004 & L1005 from Ventura Compressor Station to La Goleta Storage

L1003

100

Optimizes the performance of the Distribution pipeline systems by facilitating innovative idea, providing strategic and accurate engineering assessments, design, and approvals, and maximizing response time for planned, emergency, and high pressure close out work.

Distribution Engineering

100

An application that uses a set of equations which

represent a network interconnection based on

Kirchhoff’s first law.

Synergi Gas

100

Maximum pressure at which a pipeline or segment of a pipeline may be operated.

MAOP

200

ECDA

External Corrosion Direct Assessment

200

Storage Field that supplies L1192, L1181 & L1181

Aliso Canyon

200

Department that uses technique by which underground metallic pipe is protected against deterioration.

Cathodic Protection

200

framework for gathering, managing, and analyzing data. Rooted in the science of geography.

It analyzes spatial location and organizes layers of information into visualizations using maps

GIS

200

A distribution line that serves as a common source of supply for more than one service line

Main


300

PSEP

Pipeline Safety Enhancement Plan

300

Storage field with the highest withdraw rate to inventory ratio

Playa Del Rey (PDR)

300

provides technical and engineering support in the areas of corrosion protection and treatment, pipeline design (structural, seismic, Design Data Sheet, pipe stress), pipeline materials specifications, metallurgy

Pipeline Integrity

300

Form sent from AEs for NGV costumers that request a project site feasibility.

(Full title)

Preliminary Site Evaluation (PSE)

300

A device run inside a pipeline to clean or inspect the pipeline, or to batch fluids.

Pig (in line inspection tool)

400

PHMSA

Pipeline and Hazardous Materials Safety Administration

400

sturdy, combination package designed to remove contaminants from liquid-free natural gas streams.

high gas/low liquid flow operations and are typically employed upstream and downstream of compressors regulator stations and limiting station.

Filter Separator

400

Responsible for the facilitation, coordination, and collaboration with Subject Matter Experts in Gas Engineering to identify, review and complete engineering deliverables accurately and timely.

Project Engineering

400

Database that maintains historical pressure, usage, and alarms from electronic pressure monitors and EVCs

HeadEnd

400

A condition identified by the Company that may indicate there is a malfunction of a component or a deviation from normal operations and which may indicate a condition exceeding design limits or otherwise resulting in a hazard to the public, property, individuals, or the environment.-

Abnormal Operating Conditions (AOC)
500

SCADA

Supervisory control and data acquisition

500

Receipt point within the NW territory which SoCalGas receives gas from Kern / Mojave Pipeline

Wheeler Ridge

500
Responsible for maximizing system capacity by balancing the pipeline transmission system between in state and out of state scheduled receipts and forecasted system demand, declaring operational flow orders and winter balancing enforcements.

Gas Scheduling

500

System management database that stores pressure reporting integration and data for distribution systems, including pipelines, reg. stations, and EPM information.

PRISM

500

An inspection technique that does not damage the item being examined. This technique includes visual, radiography, ultrasonic, electromagnetic and dye penetrant methods

Nondestructive Examination (NDE)

M