Wildfire Mitigation
Load Growth
Grid Modernization
Infrastructure Replacement
Program Mechanics
100

This program uses triple-layered conductor design to reduce ignition risk in HFRAs.

What is Covered Conductor (WCCP)?

100

This program forecasts work outside substations to relieve overloaded circuits.

What is Distribution Circuit Upgrades (DCU)?

100

This automation program supports DER growth with intelligent switches.

What is DER-driven Distribution Automation?

100

This program replaces obsolete oil-filled ARs with vacuum switches.

What is Auto Recloser (AR) Replacement?

100

This document captures program purpose, stakeholders, and scoping methodology.

What is a Program Profile?

200

These devices detect high-frequency emissions from arcing in HFRAs.

What are Early Fault Detection (EFD) devices?

200

These new circuits serve areas with no existing infrastructure or limited ties.

What is DSP New Circuit?

200

This automation program enhances reliability and prepares for high-DER penetration.

What is Reliability-driven Distribution Automation?

200

This subprogram replaces aging cables that can't be rejuvenated.

What is Cable-in-Conduit (CIC) Replacement?

200

This system of record is used for PIF programs like WCCP and TUG.

What is Copperleaf?

300

This program aims to reduce PSPS de-energization through sectionalizing.

What is Public Safety Power Shutoff (PSPS)?

300

This catch-all program addresses local needs not covered by DCU.

What is Plant Betterment?

300

These MAT codes are used for DERDA UG and OH starting in 2026.

What are 4PO and 4PN?

300

This program injects silicone fluid to extend cable life.

What is Cable Life Extension (CLE)?

300

This Excel template is used for Non-PIF scope release.

What is the Non-PIF Commodity Scope Release Template?

400

REFCL installations include these two protective measures.

What are Ground Fault Neutralizers (GFN) and Grounding Conversions (GC)?

400

These devices help maintain voltage by supplying reactive power.

What are New Capacitors?

400

This system of record tracks Grid Mod automation projects.

What is MDI?

400

These devices are replaced under General Order 165.

What are Capacitor Banks?

400

This lifecycle phase spans Gates 1–6.

What is Total Cycle Time?

500

This undergrounding program removes OH infrastructure to reduce wildfire risk.

What is Targeted Undergrounding (TUG)?

500

This CAVA program improves circuit operability in flood/fire-prone areas.

What is CAVA OH/UG Circuit Ties?

500

These sensors and RFIs are deployed to monitor power quality.

What are Grid Mod DERDA components?

500

This program replaces UG switches prone to violent failures.

What is Underground Switch Replacement (UGSW)?

500

This MAT code is used for Live Front Transformer Replacement.

What is 2FI?

M
e
n
u