RTCR
Public Notice
Chems, Rads, DBPs
Lead & Copper
Kitchen Sink
100

This type of assessment is performed by the system following multiple TC+s in a monitoring period.

Level 1 assessment

100

The Public Notification Rule only applies to these types of water systems.

All public water systems / NTNC, transient, community

100

The peak month, generally, for peak DBP formation.

August

100

The lead and copper action levels are based on this number percentile level of tap water samples.

90th

100

The day of the week that the Monitoring Schedules get updated.


Thursday (Wednesday night is also acceptable).

200

If present, this should be removed from the tap prior to collecting a TC sample.

The aerator

200

These documents must be submitted for the Department to know the public notice was delivered appropriately.

Copy of public notice and Certificate of delivery form

200

The location you will collect your annual nitrate sample.

Entry point

200

The number of days do you have to distribute a copy of lead tap sample results to the customer after receiving them.

30 days

200

Surface water requirements are (more or less) involved than groundwater requirements.

More

300

RTCR samples are collected at this location(s).

Distribution System taps

300

This number represents the number of elements that must be included in each public notice.

10

300

Compliance for VOC maximum contaminant levels is based on this calculation.

The locational running annual average or LRAA

300

What form do you need to submit to the department via the Portal if a high tier lead and copper sample site is vacant and cannot be sampled. 

Certification for Unavailable High Risk Sites form

300

The person you call if you have a question about your requirements as an operator for a public water system.

Your compliance specialist

400

Your system operates seasonally from May through October. This year, there was a massive snow storm and your system closed early on October 5. You must collect a sample in October still (true or false).

Trye

400

The Tier of public notice that requires issuing the notice as soon as practical, but no later than 30 days after learning of the violation.

Tier 2

400

DBP sample sites always the same for HAA5 and TTHM (true or false).


False

400

The minimum number of lead and copper sample sites as system must maintain in their sample pool is based on this.

Population.

400

The population category of a water system employee with access to the drinking water from 9a-5p every day between May 1 and October 31. 


Non-transient

500

The term for a sample called that is not collected in accordance with the sampling plan.

Special purpose sample

500

This notifies consumers about their water quality and contaminant risks on an annual basis.

Consumer Confidence Report (CCR)

500

The main health risk related to nitrate and nitrite is Methemoglobinemia, otherwise known as this.

Blue baby syndrome 

500

The year that the lead and copper Tier levels will change under the Lead and Copper Rule Improvements (LCRI).

2027 (2028 is acceptable)

500

Transient Non-Community systems must monitor for SOCs/VOCs/IOCs, DBPs, lead and copper, and radionuclides (true or false).

False

M
e
n
u