This is who a BA contacts when handling BIQ Gates.
Who is the QA Lead? (Krishna)
This section of the feature is where the system engineer lists out the impacted teams on a standard feature.
What is the High Level Design?
DOUBLE POINTS: TWO ANSWERS - This is the total time DSP and Billing is currently finishing features (from requirements to release)
What is 72/60 Days?
What does DICO stand for and what application has it recently been added to?
Digitally Integrated Customer Offer, to VisionLink
Who in our team played the trumpet from 5th grade through high school?
Josh
Name the two tasks required to be completed before the feature moves to design.
Business Analyst to Provide Input to Help Content
Digital Content Author to Document Help Requirements
This percentage completion is needed for the Wireframes when listing out SLA/Performance and Wireframe Dependencies.
What is 80%?
How many features did DSP/Billing release in Q2 2024?
115 Features
Name 5 out of 8 items within an MRD Pulse Check
E2ET (Yes or No), Release Notes (Yes or No), UI Impact (Yes or No), T-Shirt Size, Charge Code, System Engineer Assigned, Complexity Assessment assigned to Arun, Figma
Who in our team still owns their first car?
Jim (18 Years)
These two feature fields must be synced when a wireframe change occurs.
What is the Acceptance Criteria and Figma?
This Board Column: System Engineer schedules and conducts design collaboration(s) for a standard feature.
What is "In Design"?
When adding a feature to the Aha backlog, these seven fields are the most important to the program manager.
Program, Tenrox Project ID, Time Criticality, Epic Parent, Priority, Charge Code, RICE Scoring
Name 2 of the areas or products of ALI – Aftermarket Leads & Insights.
Condition Monitoring, Advanced Diagnostics, Lens analytics, eCommerce analytics, STU, OLGA, DNA
Whose name is also a comic book character?
Conrad (Dr. Conrad Roundshoe in a series called Demongate -Sirius Entertainment)
These four roles are tagged when requirements are completed, and the feature is moving to design.
Who is the PO, PM, and System Engineer? (AND NEW: Engineering Manager)
If the Engineering Manager identifies a feature as Complex, what happens to the feature?
Board Column moved to Solution Design (Complex) and assigned to Ashok for review.
This tool is now used for demand intake ideas (internal).
What is Aha! Ideas Portal?
What does PSE stand for and who are the sent to?
Prioritized Service Event, sent from Caterpillar to the dealer PSSR
Who in our team loves to do sudoku and puzzles?
Deepiga
This style of documenting/updating requirements is used when there is an inquiry about a requirement in review.
What is Q&A Style? (Question and Answer)
This field is verified with the PM Report and the most important during the LLD Assigned.
What is the LLD target resolve date?
As of this week, what is the proposed DSP Multiproduct Launch Date.
November 15, 2024
DAILY DOUBLE - First Team to name all Engineering PO's and their team names.
Vinitha (Avengers)
Alphonsa (Daredevils)
Shilpa (Jaguars)
Saravanan (Rockerz)
Gita (Phantoms)
Basappa (DSP Mobile)
Krithika (Cat Digital Billing)
Jyothi (Pistons)
Sumanth Darisa (Catalog)
Who Graduated high school without taking their senior year?
Jenny