Metro/APM
Coefficients/Flow Rate
Specs
PDP
Equipment Locations
100

First step to test electricity in the rail

The Hot Stick

100

1 3/4 inch coefficient

15.5

100

Weight

49,800

100

What is the equation for PDP

PDP=FL+NP/RP+-EL+AP

100

2 1/2inch high rise pack

centered between 1 3/4 and 3 inch on rear hose bed

200

Warning device to know when power comes back

WSAD

200

15/16 smoothbore flow rate

185gpm

200

Fuel Tank

75 gallons

200

200' 1 3/4 50/150

120

200
Socket Set

Officer side rear compartment

300

First Engine Assignment 

Abandon rig, recon, third rail power, train status, and CAN report

300

1 1/8 flow rate

250gpm

300

Wheelbase

16'6"

300

500 feet 3inch flowing blitzfire at 300gpm

127psi

300

Low Level Strainer

rear coffin
400

Channel used to contact central

3 India

400

What is the flow rate and PSI of the fog nozzle deck gun

350gpm@50 1250@75

400

Generator

Onan 10kw

400

200' 4inch to the tower 60' elevation 1000gpm smoothbore

155

400

Bottle Jack

Officer side rear second polybox from the right

500

Third Engine Assignment

Water supply, supply system 

500

How does an automatic nozzle work

automatic nozzle works by pressure given onto spring causing more GPM

500

Full name of the Light Tower

Night Scan Chief Magna (4) 900 watt lights

500

Dual 3inch lines 600 feet 1200gpm with 20 feet elevation

202psi but MWAA only allows 200psi

500

Pipe Wrench

High Rise bag driver side over the wheel

M
e
n
u