Aluminum comes from Bauxite ore
TRUE
Name ALL of PPE requirements for the Reversing Room
Bunny SUIT, Gloves, face mask, shoes/boots
What is the mission statement for AESC
To solve challenges for a sustainable future
Name 4 materials used in winding
cathode foil, anode foil, separator film, blue film
What should be inspected first when a package has been received from the line-warehouse
the outer package for NO damage
Is copper a chemical or natural element
chemical
Safety glasses must have what code on them in order to be OSHA certified
ANSI "Z87.1"
What is the vision of AESC
Leading De-Carbonization Revolution through AIOT defined battery solutions
Name the Quality gates
Never Build
Never Receive
Never Pass
What 3 things has to be verified on each/every package received from the line-warehouse
material # , batch #, production date
A workplace organization method that aims to improve efficiency and effectiveness through five key steps
5s
Who has the authority to STOP a job IF it's UNSAFE
ANYONE
What is the mission statement of launch leaders
To transfer knowledge to entry level employees
Winder Operators perform quality checks how often on a daily shift
Every 6 hours
When operating the overhead crane, what additional PPE MUST be worn
Safety Helmet
5S was originated in what country
JAPAN
Which organizational methodology is required before starting work
5S
Name 2 of the 4 PowerPoint Parameters
Use standard AESC template
Have outline page, summarize topic of discussion
Font
Size 16-24 , depending on slide and content
5 steps for LOTO
stop, manual, confirm, lock, remove key and place in pocket
If package has been received with damaged, who do you notify and when
Team Lead and Quality Control
A native of Japan, known for HIS "5S" invention and "Just In Time"
Hiroyuki Hirano
According to OSHA what is the MOST COMMON work- related bodily injury
Cuts from knives
Name 4 guidelines to follow when training a new employee (TRAIN the TRAINER)
Hint:4 words
Prep, Show, Do, Check
The ongoing never-ending cycle of removing waste and increase value
LEAN
Define the acronym D.O.W.N.T.I.M.E.
defects,overproduction,waiting,non-utilized talent, transportation,inventory,motion,extra processing