IWP
Integrated Work Plan
FOH
Front of House
WBS
Work Breakdown Structure
TAB
Test and Balance
ATS
Automatic Transfer Switch
VESDA
Very Early Smoke Detection Apparatus
RFQ
Request for Qualifications
UPS
PTP
Pre Task Plan
BDF
Building Distribution Frame
WWP
Weekly Work Plan
FACNET
Facility Network
MSG
Main Switch Gear
CAS
Cold Air Supply
PCIM
Project Cost Issue Management
RPP
Remote Power Panel
KPI
Key Performance Indicators
MDF
Main Distribution Frame
5S (name all 5)
Sort Straighten Shine Standardize Sustain
CxA
Commissioning Authority/Agent
UPS
Uninterruptible Power Supply
BMS
Building Management System
OFCI
Owner Furnished Contractor Installed
CIA
Construction Incident Analysis
ODG
Optimized Delivery Goal
PEMB
Pre Engineered Metal Building
PPC
Percent Planned Complete
FPT
Functional Performance Test
BMS
Building Management System
EPMS
Electrical Power Monitoring System
PCO
Proposed Change Order
XFN
Cross Functional
TRIR
IDF
Intermediate Distribution Frame
LPS
The Last Planner System
IST
Integrated Systems Testing
LBSB
Load Bank Switch Board
SCADA
Supervisory Controls and Data Acquisition
ICM
Infrastructure Construction Management
GDCC
Global Data Center Connectivity
ITP
Inspection Testing Plan
IBOS
Infrastructure Business Operations Support
TIA
Time Impact Analysis
ETL
Equipment Tracking Log
PDU
Power Distribution Unit
IWS
Industrial Water Supply
OCIP
Owner Furnished Insurance Program
PTX
Power Transformer
RCA
Root Cause Analysis
HAC
Hot Aisle Containment
POND
Plan of Next Day
DCC
Data Center Connectivity
CRAC
Computer Room Air Conditioner
IMWP
Insulated Metal Wall Panels
CCD
Construction Change Directive
MPOE
Main Point of Entry
RTFT
Right the First Time
BOH
Back of House
CPM
Critical Path Method
SOO
Sequence of Operations
VFD
EPMS
Electrical Power Management System
MST
Management Support Team
ECH
Evaporative Cooling and Humidification