Project Management
CPM and PERT
Earth Day Project
Complex Questions
Project Acceleration
100

The phases of project management

Planning, programming and control

100

In complex projects, is it better to use Gantt or CPM and PERT?

CPM and PERT

100

The task

The installation of a super fancy, computerized air pollution control machine for the plant.


100

What does IC (ES) and TC (EF) stand for?

Earliest start and earliest finish.

100

The process by which the duration of the project is shortened in the simplest way possible

Acceleration of the project.

200

Name four traditional members/divisions of a project

President, Human Resources, Marketing, Finance, Design, Quality Control and Production

200

The first two steps in PERT and CPM

1) Define the project and prepare the structure of the division of labor. 2) Develop relationships between activities; Decide which should come first and which should follow others.

200

Original deadline

16 weeks in order for the machine to be ready for Earth Day.

200

If an activity has only an immediate precedent, then:

its CI is equal to the TC of its predecessor.

200

The cost of speeding up (or shortening) an activity depends on:

The nature of the activity

300

The can find pressure from the shareholders of the company, fake news about the project, pressures to sacrifice the quality of the product in order to reduce costs and many more. 

The managers.

300

Difference between AEN and AEF

in an AEN diagram, the nodes represent the activities themselves; but in an AEF network, nodes represent the start and end times of an activity, and are also called events. In an AEN network the nodes do not consume time or resources.

300

Deadline by which there's a 99% chance of completing the project.

19.1 weeks or more.

300

Slack is:

The amount of time an activity can be delayed without delaying the entire project

300

Stages 1 and 2 of accelerating a project

1) Calculate the acceleration cost per week. 2) Find the critical paths in the project network.

400

A low-cost way in which the managers can assure that all activities are planned, the order is highlighted, time estimations are included and the global time of the project is developed. 

The Gantt Graphic.

400

Two techniques have the ability to consider precedence relationships and the interdependence of activities. 

PERT and CPM

400

Probability that the project will be completed before or at the 16 week deadline.

71.57%

400

The three time estimates:

Optimistic time (a), Pessimistic time (b) and most probable time (m).

400

If a 48-hour heat treatment in the furnace is needed, we can accelerate it by:

YOU CAN'T! Some activities cannot be shortened at all.

500

Phases of the project: In this phase, people, money, supplies are related with specific activities. 

Programming.

500

What does PERT stand for?

Project evaluation and review technique.

500

The variance in the project completion time is equal to:

The sum of all the individual project activities' variances.

500

The expected time of activity formula:

t = (a + 4m + b)/6

500

Ramp-up time is:

The shortest duration needed to complete the activity.